Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Single-time pouring forming construction device for bridge prestressed box girder
The invention discloses a bridge prestressed box girder one-time pouring forming construction device which comprises a supporting face, a first motor and a pouring hopper, an arch frame is arranged at the upper end of the supporting face, a first moving mechanism is arranged on the left side of the arch frame, a fixing block is arranged at the bottom of the first moving mechanism, and a pushing mechanism is connected to the left side of the first motor. According to the construction device, an upper cover plate covers an upper opening of the pouring hopper, pouring is conducted in the sealing state of the pouring hopper, and pollution to internal materials is avoided. The bottom of the inner formwork is provided with a bottom plate, the lower end of the pouring hopper is connected with a second moving mechanism, and the left side of the arch frame is provided with a sliding mechanism.
本发明公开了一种桥梁预应力箱梁单次浇筑成型施工装置,包括支撑面、电机一和浇筑斗,所述支撑面上端设置有拱架,且拱架左侧设置有第一移动机构,并且第一移动机构底部设置有固定块,所述电机一左侧连接有推动机构,且两个推动机构之间与内模板相互接触,所述内模板底部设置有底板,所述浇筑斗下端连接有第二移动机构,所述拱架左侧设置有滑动机构,此施工装置使得上盖板盖住浇筑斗上开口,使得浇筑斗密封状态下浇筑,避免污染内部材料。
Single-time pouring forming construction device for bridge prestressed box girder
The invention discloses a bridge prestressed box girder one-time pouring forming construction device which comprises a supporting face, a first motor and a pouring hopper, an arch frame is arranged at the upper end of the supporting face, a first moving mechanism is arranged on the left side of the arch frame, a fixing block is arranged at the bottom of the first moving mechanism, and a pushing mechanism is connected to the left side of the first motor. According to the construction device, an upper cover plate covers an upper opening of the pouring hopper, pouring is conducted in the sealing state of the pouring hopper, and pollution to internal materials is avoided. The bottom of the inner formwork is provided with a bottom plate, the lower end of the pouring hopper is connected with a second moving mechanism, and the left side of the arch frame is provided with a sliding mechanism.
本发明公开了一种桥梁预应力箱梁单次浇筑成型施工装置,包括支撑面、电机一和浇筑斗,所述支撑面上端设置有拱架,且拱架左侧设置有第一移动机构,并且第一移动机构底部设置有固定块,所述电机一左侧连接有推动机构,且两个推动机构之间与内模板相互接触,所述内模板底部设置有底板,所述浇筑斗下端连接有第二移动机构,所述拱架左侧设置有滑动机构,此施工装置使得上盖板盖住浇筑斗上开口,使得浇筑斗密封状态下浇筑,避免污染内部材料。
Single-time pouring forming construction device for bridge prestressed box girder
一种桥梁预应力箱梁单次浇筑成型施工装置
WANG YANFENG (Autor:in) / ZHANG YUNGUANG (Autor:in) / ZHANG HONGLING (Autor:in)
04.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
B28C
Tonaufbereitung
,
PREPARING CLAY
GIRDER BRIDGE CONSTRUCTION METHOD OF PRESTRESSED GIRDER
Europäisches Patentamt | 2021
GIRDER BRIDGE CONSTRUCTION METHOD OF PRESTRESSED GIRDER
Europäisches Patentamt | 2020
|CONSTRUCTION METHOD OF PRESTRESSED COMPOSITE GIRDER BRIDGE
Europäisches Patentamt | 2015
Continuous bridge girder prestressed in single operation
Engineering Index Backfile | 1953
|PRESTRESSED CONCRETE GIRDER AND BRIDGE CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2021