Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Combined supporting structure of cantilever plate
The invention relates to a combined supporting structure of a cantilever plate, and belongs to the field of cantilever plates, the combined supporting structure comprises a wall body, a pouring box is mounted on the wall body, a feeding hole is formed in the pouring box, a first feeding pipe is arranged on the pouring box, the first feeding pipe is communicated with the feeding hole, a second feeding pipe is arranged outside the pouring box, and the second feeding pipe is communicated with the feeding hole. And an exhaust hole is formed in the pouring box. According to the cantilever plate, concrete is conveyed into the pouring box through the second feeding pipe and the first feeding pipe, when the pouring box is filled with the concrete, conveying of the concrete is stopped, and the pouring box is dismantled after the concrete is solidified, so that the possibility that gaps are generated in the pouring box after the concrete is solidified is reduced, and the structural strength of the cantilever plate is improved.
本申请涉及一种悬挑板的组合支撑结构,属于悬挑板的领域,其包括墙体,墙体上安装有浇筑盒,浇筑盒上开设有进料孔,浇筑盒上设置有第一进料管,第一进料管与进料孔连通,浇筑盒外设置有第二进料管,第二进料管与进料孔连通,浇筑盒上开设有排气孔。本申请中,混凝土通过第二进料管和第一进料管运输至浇筑盒内,待浇筑盒内充满混凝土时,停止混凝土的输送,待混凝土凝固后拆除浇筑盒,降低了混凝土凝固后在浇筑盒内产生空隙的可能性,提高了悬挑板的结构强度。
Combined supporting structure of cantilever plate
The invention relates to a combined supporting structure of a cantilever plate, and belongs to the field of cantilever plates, the combined supporting structure comprises a wall body, a pouring box is mounted on the wall body, a feeding hole is formed in the pouring box, a first feeding pipe is arranged on the pouring box, the first feeding pipe is communicated with the feeding hole, a second feeding pipe is arranged outside the pouring box, and the second feeding pipe is communicated with the feeding hole. And an exhaust hole is formed in the pouring box. According to the cantilever plate, concrete is conveyed into the pouring box through the second feeding pipe and the first feeding pipe, when the pouring box is filled with the concrete, conveying of the concrete is stopped, and the pouring box is dismantled after the concrete is solidified, so that the possibility that gaps are generated in the pouring box after the concrete is solidified is reduced, and the structural strength of the cantilever plate is improved.
本申请涉及一种悬挑板的组合支撑结构,属于悬挑板的领域,其包括墙体,墙体上安装有浇筑盒,浇筑盒上开设有进料孔,浇筑盒上设置有第一进料管,第一进料管与进料孔连通,浇筑盒外设置有第二进料管,第二进料管与进料孔连通,浇筑盒上开设有排气孔。本申请中,混凝土通过第二进料管和第一进料管运输至浇筑盒内,待浇筑盒内充满混凝土时,停止混凝土的输送,待混凝土凝固后拆除浇筑盒,降低了混凝土凝固后在浇筑盒内产生空隙的可能性,提高了悬挑板的结构强度。
Combined supporting structure of cantilever plate
一种悬挑板的组合支撑结构
FENG BO (Autor:in) / CHEN WENXIANG (Autor:in) / GONG DEJIN (Autor:in) / ZHOU YAN (Autor:in) / XIANG WEIKANG (Autor:in) / YI XIUCHENG (Autor:in) / ZHAO QINGJIE (Autor:in) / ZHANG HUI (Autor:in)
04.07.2023
Patent
Elektronische Ressource
Chinesisch
Combined supporting platform for high-altitude cantilever structure construction
Europäisches Patentamt | 2023
|Combined type cantilever supporting structure and construction method thereof
Europäisches Patentamt | 2024
|