Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated building wall splicing structure
The invention relates to the technical field of fabricated buildings, in particular to a fabricated building wall splicing structure which comprises a first wall, a second wall, a third wall and a fourth wall. A hook is arranged on the surface of the second wall body, a through groove is formed in the surface of the hook, a filling groove is formed in the surface of the second wall body, a second inserting hole is formed in the surface of the second wall body, an inserting block is inserted into the second inserting hole, and a through hole is formed in the surface of the inserting block; the first inserting hole is formed in the surface of the first wall body; the concrete pouring device has the beneficial effects that after the first wall body is fixed, concrete is poured into the pouring groove, a baffle blocks the concrete in the pouring groove, a hook at the end of a second wall body is inserted into the pouring groove, the hook pushes an arc-shaped plate, the baffle is retracted into the first wall body, and the concrete in the pouring groove enters the pouring groove; and a screw rod is screwed, so that the end part of the screw rod is screwed in a screw hole in the surface of the moving block.
本发明涉及装配式建筑技术领域,具体为一种装配式建筑墙体拼装结构,包括:第一墙体,第一墙体的表面开设有灌入槽;第二墙体,第二墙体的表面设置有挂钩,挂钩的表面开设有通槽,第二墙体的表面开设有灌入槽,第二墙体的表面开设有第二插接孔,第二插接孔中插接有插接块,插接块的表面开设有通孔;及第一插接孔,设于第一墙体的表面;有益效果为:本发明提出的第一墙体固定好后,向灌入槽中注入混凝土,挡板将灌入槽中的混凝土阻挡,将第二墙体端部的挂钩插接在灌入槽中,挂钩顶推弧形板,使得挡板收进第一墙体内部,灌入槽中的混凝土进入灌入槽中,且通过通槽快速进入到灌入槽中,旋拧螺杆,使得螺杆的端部螺接在移动块表面的螺孔中。
Fabricated building wall splicing structure
The invention relates to the technical field of fabricated buildings, in particular to a fabricated building wall splicing structure which comprises a first wall, a second wall, a third wall and a fourth wall. A hook is arranged on the surface of the second wall body, a through groove is formed in the surface of the hook, a filling groove is formed in the surface of the second wall body, a second inserting hole is formed in the surface of the second wall body, an inserting block is inserted into the second inserting hole, and a through hole is formed in the surface of the inserting block; the first inserting hole is formed in the surface of the first wall body; the concrete pouring device has the beneficial effects that after the first wall body is fixed, concrete is poured into the pouring groove, a baffle blocks the concrete in the pouring groove, a hook at the end of a second wall body is inserted into the pouring groove, the hook pushes an arc-shaped plate, the baffle is retracted into the first wall body, and the concrete in the pouring groove enters the pouring groove; and a screw rod is screwed, so that the end part of the screw rod is screwed in a screw hole in the surface of the moving block.
本发明涉及装配式建筑技术领域,具体为一种装配式建筑墙体拼装结构,包括:第一墙体,第一墙体的表面开设有灌入槽;第二墙体,第二墙体的表面设置有挂钩,挂钩的表面开设有通槽,第二墙体的表面开设有灌入槽,第二墙体的表面开设有第二插接孔,第二插接孔中插接有插接块,插接块的表面开设有通孔;及第一插接孔,设于第一墙体的表面;有益效果为:本发明提出的第一墙体固定好后,向灌入槽中注入混凝土,挡板将灌入槽中的混凝土阻挡,将第二墙体端部的挂钩插接在灌入槽中,挂钩顶推弧形板,使得挡板收进第一墙体内部,灌入槽中的混凝土进入灌入槽中,且通过通槽快速进入到灌入槽中,旋拧螺杆,使得螺杆的端部螺接在移动块表面的螺孔中。
Fabricated building wall splicing structure
一种装配式建筑墙体拼装结构
CHEN CHUNLAI (Autor:in) / ZHU YINCHAO (Autor:in)
04.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Fabricated shear wall splicing seam waterproof structure
Europäisches Patentamt | 2023
|Wallboard splicing structure of fabricated wall surface
Europäisches Patentamt | 2020
|