Ceiling bottom unit curtain wall installation system and construction method thereof
According to the ceiling bottom unit curtain wall installation system and the construction method thereof, the hanging rings (300) are arranged in the gaps between the edges of the bottom curtain wall plate blocks (220) and the surface of the building body (110), the bottom curtain wall plate blocks (220) of an outward-protruding auxiliary building body are allowed to be firstly completed through a scaffold of the building body (110), and after the scaffold is dismantled, the hanging rings (300) are installed on the bottom curtain wall plate blocks (220) of the outward-protruding auxiliary building body. And the hanging rings (300) are used for hanging the main body unit glass indoors so as to complete the laying of the main body curtain wall plate (210) of the building main body (110). Repeated construction of the scaffold is reduced, and the high-altitude construction difficulty is lowered. And meanwhile, the main body curtain wall plate (210) can cover a gap between the bottom curtain wall plate (220) and the surface of the building main body (110), so that gap closing is completed.
本申请实施例提供了一种天花板底单元幕墙安装系统及其施工方法,通过在底部幕墙板块(220)的边缘与建筑主体(110)的表面之间的间隙设置吊环(300),允许利用建筑主体(110)的脚手架先完成外凸附属建筑体的底部幕墙板块(220),待拆除脚手架后,利用吊环(300)来从室内吊装主体单元玻璃去完成建筑主体(110)的主体幕墙板块(210)铺设。减少了脚手架的重复搭建,降低了高空施工难度。同时主体幕墙板块(210)能够覆盖住底部幕墙板块(220)与建筑主体(110)表面之间的间隙,从而完成缝隙收口。
Ceiling bottom unit curtain wall installation system and construction method thereof
According to the ceiling bottom unit curtain wall installation system and the construction method thereof, the hanging rings (300) are arranged in the gaps between the edges of the bottom curtain wall plate blocks (220) and the surface of the building body (110), the bottom curtain wall plate blocks (220) of an outward-protruding auxiliary building body are allowed to be firstly completed through a scaffold of the building body (110), and after the scaffold is dismantled, the hanging rings (300) are installed on the bottom curtain wall plate blocks (220) of the outward-protruding auxiliary building body. And the hanging rings (300) are used for hanging the main body unit glass indoors so as to complete the laying of the main body curtain wall plate (210) of the building main body (110). Repeated construction of the scaffold is reduced, and the high-altitude construction difficulty is lowered. And meanwhile, the main body curtain wall plate (210) can cover a gap between the bottom curtain wall plate (220) and the surface of the building main body (110), so that gap closing is completed.
本申请实施例提供了一种天花板底单元幕墙安装系统及其施工方法,通过在底部幕墙板块(220)的边缘与建筑主体(110)的表面之间的间隙设置吊环(300),允许利用建筑主体(110)的脚手架先完成外凸附属建筑体的底部幕墙板块(220),待拆除脚手架后,利用吊环(300)来从室内吊装主体单元玻璃去完成建筑主体(110)的主体幕墙板块(210)铺设。减少了脚手架的重复搭建,降低了高空施工难度。同时主体幕墙板块(210)能够覆盖住底部幕墙板块(220)与建筑主体(110)表面之间的间隙,从而完成缝隙收口。
Ceiling bottom unit curtain wall installation system and construction method thereof
天花板底单元幕墙安装系统及其施工方法
TANG JUNYAO (Autor:in) / WANG SINIAN (Autor:in) / GU SHAOXI (Autor:in) / ZHANG QISHAN (Autor:in) / DONG XIANGQIAO (Autor:in) / WANG MIAO (Autor:in)
04.07.2023
Patent
Elektronische Ressource
Chinesisch
Ceiling curtain wall structure and installation method thereof
Europäisches Patentamt | 2020
|CURTAIN WALL UNIT, CURTAIN WALL INSTALLATION STRUCTURE, AND INSTALLATION METHOD OF CURTAIN WALL
Europäisches Patentamt | 2017
|CURTAIN WALL UNIT, CURTAIN WALL INSTALLATION STRUCTURE, AND INSTALLATION METHOD OF CURTAIN WALL
Europäisches Patentamt | 2017
|Curtain wall installation system and application construction method thereof
Europäisches Patentamt | 2020
|