Lantern-shaped ridge frame and construction method thereof
The invention relates to the technical field of building construction engineering, and particularly discloses a lantern-shaped ridge frame and a construction method thereof.The ridge frame comprises concrete bases, pre-embedded steel ribs are arranged in the concrete bases, support steel plates are arranged at the tops of the pre-embedded steel ribs, ridge main beams are arranged between the concrete bases, and the ridge main beams are connected with the support steel plates; the two ends of the ridge main beam are fixed to the support steel plates of the corresponding concrete bases respectively. The ridge main beam comprises a main beam section I, a main beam section II and a main beam section III, and the main beam section I and the main beam section III are fixed to the two sides of the main beam section II respectively and are symmetrically arranged relative to the main beam section II to form an inverted-L-shaped structure. The method is completed by welding the multiple sections, a stable lantern-shaped structure can be formed, all the sections can be conducted on the ground or in a factory, the construction speed is high, the cost is low, in the construction process, the supporting frames at the butt joint ends of the main beam sections can provide better support for the ends of the main beam sections which are in butt joint with one another, and connection between the main beam sections is more convenient.
本发明涉及建筑施工工程的技术领域,尤其是公开了一种灯笼形屋脊框架及其施工方法,屋脊框架包括混凝土基座,混凝土基座内设有预埋钢骨,预埋钢骨顶部设有支座钢板,混凝土基座之间设有屋脊主梁,屋脊主梁的两端分别固定在对应混凝土基座的支座钢板上;屋脊主梁包括主梁分段Ⅰ、主梁分段Ⅱ和主梁分段Ⅲ,主梁分段Ⅰ与主梁分段Ⅲ分别固定在主梁分段Ⅱ的两侧并且关于主梁分段Ⅱ对称设置,形成“ ”形结构。本发明是由多个分段焊接完成,能够形成稳定的灯笼形结构,各个分段均可在地面或工厂内进行,施工速度快、成本低,施工过程中,主梁分段对接端处的支撑架能够为相互对接的主梁分段端头提供更好的支撑,更便于主梁分段之间的连接。
Lantern-shaped ridge frame and construction method thereof
The invention relates to the technical field of building construction engineering, and particularly discloses a lantern-shaped ridge frame and a construction method thereof.The ridge frame comprises concrete bases, pre-embedded steel ribs are arranged in the concrete bases, support steel plates are arranged at the tops of the pre-embedded steel ribs, ridge main beams are arranged between the concrete bases, and the ridge main beams are connected with the support steel plates; the two ends of the ridge main beam are fixed to the support steel plates of the corresponding concrete bases respectively. The ridge main beam comprises a main beam section I, a main beam section II and a main beam section III, and the main beam section I and the main beam section III are fixed to the two sides of the main beam section II respectively and are symmetrically arranged relative to the main beam section II to form an inverted-L-shaped structure. The method is completed by welding the multiple sections, a stable lantern-shaped structure can be formed, all the sections can be conducted on the ground or in a factory, the construction speed is high, the cost is low, in the construction process, the supporting frames at the butt joint ends of the main beam sections can provide better support for the ends of the main beam sections which are in butt joint with one another, and connection between the main beam sections is more convenient.
本发明涉及建筑施工工程的技术领域,尤其是公开了一种灯笼形屋脊框架及其施工方法,屋脊框架包括混凝土基座,混凝土基座内设有预埋钢骨,预埋钢骨顶部设有支座钢板,混凝土基座之间设有屋脊主梁,屋脊主梁的两端分别固定在对应混凝土基座的支座钢板上;屋脊主梁包括主梁分段Ⅰ、主梁分段Ⅱ和主梁分段Ⅲ,主梁分段Ⅰ与主梁分段Ⅲ分别固定在主梁分段Ⅱ的两侧并且关于主梁分段Ⅱ对称设置,形成“ ”形结构。本发明是由多个分段焊接完成,能够形成稳定的灯笼形结构,各个分段均可在地面或工厂内进行,施工速度快、成本低,施工过程中,主梁分段对接端处的支撑架能够为相互对接的主梁分段端头提供更好的支撑,更便于主梁分段之间的连接。
Lantern-shaped ridge frame and construction method thereof
一种灯笼形屋脊框架及其施工方法
SONG HUAFENG (Autor:in) / LI XIAOHUI (Autor:in) / ZHOU DAWEI (Autor:in) / PEI YUFENG (Autor:in) / LU SHAOYANG (Autor:in) / LI HONGJU (Autor:in) / LI XINGWEI (Autor:in) / XU NING (Autor:in)
04.07.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|Integral lantern type support circulating hoisting construction method for frame column
Europäisches Patentamt | 2021
|DataCite | 1893
|Oversized festive lantern mounting structure and oversized festive lantern mounting method
Europäisches Patentamt | 2023
|