The invention discloses a construction method of a reserved sleeve, which comprises the following steps of: a, covering embedded parts with end covers at two ends of a nesting component to form a combined part, and putting the combined part into a beam groove bound by reinforcing steel bars; b, fixing the fixing pieces on the templates on the two sides by using screws; c, concrete pouring is conducted; d, when the formwork is dismantled, the fixing part and the screw are reserved on the formwork, and the embedded part and the nesting assembly are reserved in the concrete beam to form a reserved sleeve; and e, after the screws are removed, the formwork is continuously used on other floors. During installation, each component can be installed at the same position, when a template is removed, a fixing piece and a screw can still adhere to an aluminum mold, and when a lower-layer sleeve is installed, the sleeve can be used as long as the fixing piece and the screw are loosened at the original position, and a new component is installed again. The time for pre-embedding and installing the board-passing wall and the beam sleeve of reserved water supply, air conditioner, natural gas and the like in the building decoration beam is greatly shortened, the working process is simplified, and the pipe cover also plays a role in temporarily plugging the sleeve hole and sealing and separating the space.
本发明公开了一种预留套管的施工方法,包括如下步骤:a.将带有端盖的预埋件盖在嵌套组件的两端形成组合件,并放入钢筋绑扎的梁槽内;b.使用螺钉将固定件固定在两侧模板上;c.进行砼浇筑;d.拆除模板时,固定件连螺钉会保留在模板上,预埋件与嵌套组件保留在混凝土梁内形成预留套管;e.拆除螺钉后在其他楼层继续使用模板。安装时,每个组件会安装在相同的位置,当模板拆除时,固定件连螺丝会仍粘在铝模上,在下层套管安装时,只要在原位置将固定件螺丝松开,重新安装上新的组件使用该套管,使得在建筑装修房梁内预留给水、空调、天然气等过板墙、梁套管预埋安装时的时间大大缩减,简化工作流程,管盖还起到临时封堵套管孔洞,密闭分隔空间的作用。
The invention discloses a construction method of a reserved sleeve, which comprises the following steps of: a, covering embedded parts with end covers at two ends of a nesting component to form a combined part, and putting the combined part into a beam groove bound by reinforcing steel bars; b, fixing the fixing pieces on the templates on the two sides by using screws; c, concrete pouring is conducted; d, when the formwork is dismantled, the fixing part and the screw are reserved on the formwork, and the embedded part and the nesting assembly are reserved in the concrete beam to form a reserved sleeve; and e, after the screws are removed, the formwork is continuously used on other floors. During installation, each component can be installed at the same position, when a template is removed, a fixing piece and a screw can still adhere to an aluminum mold, and when a lower-layer sleeve is installed, the sleeve can be used as long as the fixing piece and the screw are loosened at the original position, and a new component is installed again. The time for pre-embedding and installing the board-passing wall and the beam sleeve of reserved water supply, air conditioner, natural gas and the like in the building decoration beam is greatly shortened, the working process is simplified, and the pipe cover also plays a role in temporarily plugging the sleeve hole and sealing and separating the space.
本发明公开了一种预留套管的施工方法,包括如下步骤:a.将带有端盖的预埋件盖在嵌套组件的两端形成组合件,并放入钢筋绑扎的梁槽内;b.使用螺钉将固定件固定在两侧模板上;c.进行砼浇筑;d.拆除模板时,固定件连螺钉会保留在模板上,预埋件与嵌套组件保留在混凝土梁内形成预留套管;e.拆除螺钉后在其他楼层继续使用模板。安装时,每个组件会安装在相同的位置,当模板拆除时,固定件连螺丝会仍粘在铝模上,在下层套管安装时,只要在原位置将固定件螺丝松开,重新安装上新的组件使用该套管,使得在建筑装修房梁内预留给水、空调、天然气等过板墙、梁套管预埋安装时的时间大大缩减,简化工作流程,管盖还起到临时封堵套管孔洞,密闭分隔空间的作用。
Stadium row-up seat air supply system reserved air casing pipe construction process
Europäisches Patentamt | 2021
|Rapid plugging method for underground or top plate reserved standby casing pipe
Europäisches Patentamt | 2023
|Emergency plugging drainage device for reserved casing pipe going out of outer wall
Europäisches Patentamt | 2022
|Construction method for reserved hole of drainage stand pipe
Europäisches Patentamt | 2022
|