Construction method of cast-in-place box girder crossing existing railway bridge
The invention discloses a construction method for a cast-in-place box girder to span an existing railway bridge, which comprises the following steps of: 1, modifying a through line, and changing the electric power layout of the bridge; 2, building a construction road; 3, pile foundation construction; fourthly, a bearing platform is constructed; 5, pier body construction; and sixthly, the box girder is erected and constructed. In the implementation process, an operating railway is not damaged, and the safety of the operating railway is guaranteed; the safety of the newly-built bridge is ensured, and safety accidents are avoided; the method is simple, feasible, easy to operate and low in cost.
本发明公开了一种现浇箱梁跨越既有铁路桥梁施工工法,包括如下步骤:步骤一:修改贯通线,改变桥梁的电力布局;步骤二:修筑施工便道;步骤三:桩基施工;步骤四:承台施工;步骤五:墩身施工;步骤六:箱梁架设施工。本发明在实施过程中对运营铁路不造成破坏,保证运营铁路的安全;确保了新建桥梁的安全,不发生安全事故;简单可行,易于操作,费用较低。
Construction method of cast-in-place box girder crossing existing railway bridge
The invention discloses a construction method for a cast-in-place box girder to span an existing railway bridge, which comprises the following steps of: 1, modifying a through line, and changing the electric power layout of the bridge; 2, building a construction road; 3, pile foundation construction; fourthly, a bearing platform is constructed; 5, pier body construction; and sixthly, the box girder is erected and constructed. In the implementation process, an operating railway is not damaged, and the safety of the operating railway is guaranteed; the safety of the newly-built bridge is ensured, and safety accidents are avoided; the method is simple, feasible, easy to operate and low in cost.
本发明公开了一种现浇箱梁跨越既有铁路桥梁施工工法,包括如下步骤:步骤一:修改贯通线,改变桥梁的电力布局;步骤二:修筑施工便道;步骤三:桩基施工;步骤四:承台施工;步骤五:墩身施工;步骤六:箱梁架设施工。本发明在实施过程中对运营铁路不造成破坏,保证运营铁路的安全;确保了新建桥梁的安全,不发生安全事故;简单可行,易于操作,费用较低。
Construction method of cast-in-place box girder crossing existing railway bridge
一种现浇箱梁跨越既有铁路桥梁施工工法
XIE WENXIANG (Autor:in) / DAI DEYI (Autor:in) / ZHANG XIANZHE (Autor:in) / WU JIANHUA (Autor:in) / WANG SHUQI (Autor:in) / LIANG ZHENYE (Autor:in) / LIU YIFEI (Autor:in) / CHEN JIYAN (Autor:in) / FAN YUANPING (Autor:in) / YIN LUJUN (Autor:in)
07.07.2023
Patent
Elektronische Ressource
Chinesisch
Construction method of cast-in-place box girder crossing existing overpass
Europäisches Patentamt | 2023
|Cast-in-place box girder bridge construction structure
Europäisches Patentamt | 2024
|Installation and construction method for steel box girder crossing existing bridge
Europäisches Patentamt | 2024
|Cast-in-place beam support structure crossing channel and existing bridge and construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|