Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water, electricity and heating reserved hole construction device for housing building
The invention relates to the field of building construction, in particular to a housing building water, electricity and heat reserved hole construction device which comprises a construction frame, an upper template and a lower template, the construction frame is provided with at least one reserved hole construction unit, and the construction frame is movably assembled on the upper template; the reserved hole construction unit comprises a driving motor, a threaded rotating shaft, a guide shaft and a reserved hole sleeve, the reserved hole sleeve comprises a sleeve body, a driving plate and a guide plate, the driving plate and the guide plate are arranged in the sleeve body and connected with the sleeve body, and the sleeve body is inserted between the upper template and the lower template and is in stopping fit with the upper template and the lower template in the radial direction of the sleeve body; the threaded rotating shaft is in transmission connection with an output shaft of the driving motor and is in threaded connection with the driving plate; the guide shaft and the threaded rotating shaft are arranged in parallel at an interval, and the guide shaft penetrates through the guide plate and is in sliding fit with the guide plate; the distance between the top of the construction frame and the upper formwork is larger than the height of the barrel. According to the device, the reserved hole sleeve can be automatically mounted and dismounted, and time and labor are saved.
本发明涉及建筑施工领域,尤其涉及一种房建住宅水电暖预留洞施工装置,包括施工架、上模板和下模板,施工架上设有至少一个预留洞施工单元,施工架移动装配在上模板上;预留洞施工单元包括驱动电机、螺纹转轴、导向轴和预留洞套筒,预留洞套筒包括筒体、设置在筒体内并与筒体连接的驱动板和导向板,筒体插装在上模板与下模板之间,并且与上模板和下模板在筒体的径向上挡止配合;螺纹转轴与驱动电机的输出轴传动连接,螺纹转轴与驱动板螺纹连接;导向轴与螺纹转轴平行间隔布置,并且导向轴穿过导向板并与导向板滑动配合;施工架的顶部与上模板之间的距离大于筒体的高度。本发明能够实现预留洞套筒的自动安装和拆除,省时省力。
Water, electricity and heating reserved hole construction device for housing building
The invention relates to the field of building construction, in particular to a housing building water, electricity and heat reserved hole construction device which comprises a construction frame, an upper template and a lower template, the construction frame is provided with at least one reserved hole construction unit, and the construction frame is movably assembled on the upper template; the reserved hole construction unit comprises a driving motor, a threaded rotating shaft, a guide shaft and a reserved hole sleeve, the reserved hole sleeve comprises a sleeve body, a driving plate and a guide plate, the driving plate and the guide plate are arranged in the sleeve body and connected with the sleeve body, and the sleeve body is inserted between the upper template and the lower template and is in stopping fit with the upper template and the lower template in the radial direction of the sleeve body; the threaded rotating shaft is in transmission connection with an output shaft of the driving motor and is in threaded connection with the driving plate; the guide shaft and the threaded rotating shaft are arranged in parallel at an interval, and the guide shaft penetrates through the guide plate and is in sliding fit with the guide plate; the distance between the top of the construction frame and the upper formwork is larger than the height of the barrel. According to the device, the reserved hole sleeve can be automatically mounted and dismounted, and time and labor are saved.
本发明涉及建筑施工领域,尤其涉及一种房建住宅水电暖预留洞施工装置,包括施工架、上模板和下模板,施工架上设有至少一个预留洞施工单元,施工架移动装配在上模板上;预留洞施工单元包括驱动电机、螺纹转轴、导向轴和预留洞套筒,预留洞套筒包括筒体、设置在筒体内并与筒体连接的驱动板和导向板,筒体插装在上模板与下模板之间,并且与上模板和下模板在筒体的径向上挡止配合;螺纹转轴与驱动电机的输出轴传动连接,螺纹转轴与驱动板螺纹连接;导向轴与螺纹转轴平行间隔布置,并且导向轴穿过导向板并与导向板滑动配合;施工架的顶部与上模板之间的距离大于筒体的高度。本发明能够实现预留洞套筒的自动安装和拆除,省时省力。
Water, electricity and heating reserved hole construction device for housing building
一种房建住宅水电暖预留洞施工装置
HU XIANGYUAN (Autor:in) / WANG ZHAO (Autor:in) / YAO RENYI (Autor:in) / CHEN BOWEN (Autor:in) / WANG QI (Autor:in) / JU LEI (Autor:in) / LI ZEYA (Autor:in)
07.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Water, electricity and heating reserved hole construction device for housing building
Europäisches Patentamt | 2023
|Engineering building water heating electrical reserved hole plugging assembly
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Temporary plugging device for reserved hole in building construction
Europäisches Patentamt | 2023
|Temporary plugging device for reserved hole in building construction
Europäisches Patentamt | 2023
|