Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Exterior wall deformation joint formwork system and construction method thereof
The invention discloses an outer wall deformation joint formwork system and a construction method thereof.The outer wall deformation joint formwork system comprises a bottom wall formwork unit, a side wall formwork unit and a top wall formwork unit which are used for building pouring formworks of a bottom wall construction joint, two side wall construction joints and a top wall construction joint correspondingly; each of the bottom wall template unit, the side wall template unit and the top wall template unit comprises a main template and a side template; the main formwork and the side formworks are connected through detachable connecting assemblies. The center of the main formwork is provided with a water-stop belt positioning protection area used for clamping and protecting a rubber water-stop belt. Outer wall deformation joint formwork structures are specifically arranged on a bottom wall, a side wall and a top wall respectively, and a water stop positioning protection area is additionally arranged between branch formworks, so that the problem that in the original actual construction pouring process, due to the fact that a positioning relation between a water stop connecting piece and a pouring formwork piece is not established, the water stop connecting piece cannot be connected with the pouring formwork piece is solved. And the technical problem that the position of the pre-arranged water stop connecting piece is deviated is solved.
本发明公开了一种外墙变形缝模板体系及其施工方法,外墙变形缝模板体系包括:底墙模板单元、侧墙模板单元、顶墙模板单元,分别用于对底墙施工缝、两侧墙施工缝与顶墙施工缝的浇筑模板搭建;所述底墙模板单元、侧墙模板单元和顶墙模板单元,均包括有主模板和侧模板;所述主模板与侧模板之间通过可拆卸连接组件进行连接;所述主模板中心处设有用于夹紧、保护橡胶止水带的止水带定位保护区;通过在底墙、侧墙、顶墙分别针对性的设定外墙变形缝模板结构,在所述分模板之间通过增设止水带定位保护区,解决了原有实际施工浇筑过程中,由于未能将止水连接件与浇筑模板件建立定位关系,导致对预先安置好的止水连接件造成位置偏离的技术问题。
Exterior wall deformation joint formwork system and construction method thereof
The invention discloses an outer wall deformation joint formwork system and a construction method thereof.The outer wall deformation joint formwork system comprises a bottom wall formwork unit, a side wall formwork unit and a top wall formwork unit which are used for building pouring formworks of a bottom wall construction joint, two side wall construction joints and a top wall construction joint correspondingly; each of the bottom wall template unit, the side wall template unit and the top wall template unit comprises a main template and a side template; the main formwork and the side formworks are connected through detachable connecting assemblies. The center of the main formwork is provided with a water-stop belt positioning protection area used for clamping and protecting a rubber water-stop belt. Outer wall deformation joint formwork structures are specifically arranged on a bottom wall, a side wall and a top wall respectively, and a water stop positioning protection area is additionally arranged between branch formworks, so that the problem that in the original actual construction pouring process, due to the fact that a positioning relation between a water stop connecting piece and a pouring formwork piece is not established, the water stop connecting piece cannot be connected with the pouring formwork piece is solved. And the technical problem that the position of the pre-arranged water stop connecting piece is deviated is solved.
本发明公开了一种外墙变形缝模板体系及其施工方法,外墙变形缝模板体系包括:底墙模板单元、侧墙模板单元、顶墙模板单元,分别用于对底墙施工缝、两侧墙施工缝与顶墙施工缝的浇筑模板搭建;所述底墙模板单元、侧墙模板单元和顶墙模板单元,均包括有主模板和侧模板;所述主模板与侧模板之间通过可拆卸连接组件进行连接;所述主模板中心处设有用于夹紧、保护橡胶止水带的止水带定位保护区;通过在底墙、侧墙、顶墙分别针对性的设定外墙变形缝模板结构,在所述分模板之间通过增设止水带定位保护区,解决了原有实际施工浇筑过程中,由于未能将止水连接件与浇筑模板件建立定位关系,导致对预先安置好的止水连接件造成位置偏离的技术问题。
Exterior wall deformation joint formwork system and construction method thereof
一种外墙变形缝模板体系及其施工方法
SHEN PENGFEI (Autor:in) / ZHOU QINGLEI (Autor:in) / LI ZHICHENG (Autor:in) / LI YIXIN (Autor:in)
11.07.2023
Patent
Elektronische Ressource
Chinesisch
Basement exterior wall unilateral formwork system and construction method thereof
Europäisches Patentamt | 2020
|Shear wall deformation joint formwork construction structure and construction method thereof
Europäisches Patentamt | 2022
|Deformation joint shear wall formwork structure and formwork supporting construction method
Europäisches Patentamt | 2024
|Formwork construction method for deformation joint shear wall
Europäisches Patentamt | 2024
|Novel basement exterior wall bottom formwork system and construction method thereof
Europäisches Patentamt | 2023
|