Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Three-dimensional multi-layer outer wall hanging basket installation and construction technology
The invention discloses a three-dimensional multi-level outer wall hanging basket mounting construction process which comprises the following steps: step 1, firstly, according to all outer structural surfaces rechecked on site, building outer wall hanging baskets in batches according to the shape of an outer wall surface, and firstly building an upper hanging basket system of a first level of a top layer from the top layer according to specifications; according to the method, a steel pipe scaffold shelving platform with a certain height is erected at the protruding position of a main body structure modeling platform, a hanging basket of the upper layer falls on the platform, and a hanging basket system of the lower layer is erected in a frame of the platform, so that the safety regulation that the hanging basket of the upper layer cannot fall on the ground is solved; the upper-layer hanging basket and the lower-layer hanging basket can be constructed in an up-and-down coherent mode, outer wall work can be linked and interspersed in time, the working efficiency is improved, the construction quality is guaranteed, and potential safety hazards are reduced.
本发明公开了立体式多层级外墙吊篮安装施工工艺,所述工艺包括以下步骤:步骤1、先根据现场复核所有外结构面,按外墙面造型,分批搭设外墙吊篮,先从顶层按规范搭设顶层的第一层级的上吊篮体系。本发明主要是在主体结构造型平台突出的地方,搭设一定高度的钢管脚手架搁置平台,将上层级吊篮落在此平台上,在平台的架子内部,再搭设下一层级的吊篮体系,如此则解决了上层吊篮不能落地的安全规定,又可以提前同步搭设下层吊篮,上下层吊篮可上下连贯施工,将外墙工作及时衔接、穿插,提高工作效率,保证施工质量,减少安全隐患。
Three-dimensional multi-layer outer wall hanging basket installation and construction technology
The invention discloses a three-dimensional multi-level outer wall hanging basket mounting construction process which comprises the following steps: step 1, firstly, according to all outer structural surfaces rechecked on site, building outer wall hanging baskets in batches according to the shape of an outer wall surface, and firstly building an upper hanging basket system of a first level of a top layer from the top layer according to specifications; according to the method, a steel pipe scaffold shelving platform with a certain height is erected at the protruding position of a main body structure modeling platform, a hanging basket of the upper layer falls on the platform, and a hanging basket system of the lower layer is erected in a frame of the platform, so that the safety regulation that the hanging basket of the upper layer cannot fall on the ground is solved; the upper-layer hanging basket and the lower-layer hanging basket can be constructed in an up-and-down coherent mode, outer wall work can be linked and interspersed in time, the working efficiency is improved, the construction quality is guaranteed, and potential safety hazards are reduced.
本发明公开了立体式多层级外墙吊篮安装施工工艺,所述工艺包括以下步骤:步骤1、先根据现场复核所有外结构面,按外墙面造型,分批搭设外墙吊篮,先从顶层按规范搭设顶层的第一层级的上吊篮体系。本发明主要是在主体结构造型平台突出的地方,搭设一定高度的钢管脚手架搁置平台,将上层级吊篮落在此平台上,在平台的架子内部,再搭设下一层级的吊篮体系,如此则解决了上层吊篮不能落地的安全规定,又可以提前同步搭设下层吊篮,上下层吊篮可上下连贯施工,将外墙工作及时衔接、穿插,提高工作效率,保证施工质量,减少安全隐患。
Three-dimensional multi-layer outer wall hanging basket installation and construction technology
立体式多层级外墙吊篮安装施工工艺
TAN XIAOLONG (Autor:in) / DENG JINKUI (Autor:in) / FAN HUAILIANG (Autor:in) / WU JING (Autor:in) / JIA GENG (Autor:in) / OH HYE-HYUN (Autor:in)
14.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Hanging basket based on building outer wall construction
Europäisches Patentamt | 2021
|