Beam cutting reinforcement construction method
The invention discloses a beam cutting reinforcement construction method, which belongs to the field of building safety construction, and comprises the following steps: S1, adding upright posts: adding upright posts at two ends of a cut part of a reinforced beam section as a support of the reinforced beam section after a beam body is unloaded; and S2, beam body cutting, wherein the bottom of the beam body is partially cut. And S3, beam body steel wrapping is conducted, specifically, the reinforced beam section is wrapped with the steel plate, chemical anchor bolts are driven into the reinforced beam section, and the steel plate is fixedly connected with the reinforced beam section. And S4, annular hoop plates are installed, specifically, the annular hoop plates are installed on the reinforced beam sections. And S5, glue pouring is conducted, specifically, sticky steel glue is poured around the annular hoop plate, so that the annular hoop plate is fixedly connected with the reinforced beam. The process is simple, the effect of reinforcing the beam body can be achieved through the method, the stability and safety of an original structure can be guaranteed, and the original structure is not damaged.
本发明公开了一种切梁加固施工方法,属于建筑安全建造领域,包括以下步骤:S1、增设立柱:在被加固梁段切除部分两端增设立柱,作为梁体卸载后被加固梁段支撑。S2、梁体切除:梁体底部局部切除。S3、梁体包钢:将钢板包裹在被加固梁段外,在被加固梁段打入化学锚栓,将钢板与被加固梁段固定连接。S4、安装环形箍板:在被加固梁段安装环形箍板。S5、灌胶:在环形箍板四周灌注粘钢胶,使环形箍板与被加固梁固定连接。本发明工序简单,通过以上做法可以达到对梁体加固的效果,并能够保证原有结构稳定性和安全性,使原有结构不发生破坏。
Beam cutting reinforcement construction method
The invention discloses a beam cutting reinforcement construction method, which belongs to the field of building safety construction, and comprises the following steps: S1, adding upright posts: adding upright posts at two ends of a cut part of a reinforced beam section as a support of the reinforced beam section after a beam body is unloaded; and S2, beam body cutting, wherein the bottom of the beam body is partially cut. And S3, beam body steel wrapping is conducted, specifically, the reinforced beam section is wrapped with the steel plate, chemical anchor bolts are driven into the reinforced beam section, and the steel plate is fixedly connected with the reinforced beam section. And S4, annular hoop plates are installed, specifically, the annular hoop plates are installed on the reinforced beam sections. And S5, glue pouring is conducted, specifically, sticky steel glue is poured around the annular hoop plate, so that the annular hoop plate is fixedly connected with the reinforced beam. The process is simple, the effect of reinforcing the beam body can be achieved through the method, the stability and safety of an original structure can be guaranteed, and the original structure is not damaged.
本发明公开了一种切梁加固施工方法,属于建筑安全建造领域,包括以下步骤:S1、增设立柱:在被加固梁段切除部分两端增设立柱,作为梁体卸载后被加固梁段支撑。S2、梁体切除:梁体底部局部切除。S3、梁体包钢:将钢板包裹在被加固梁段外,在被加固梁段打入化学锚栓,将钢板与被加固梁段固定连接。S4、安装环形箍板:在被加固梁段安装环形箍板。S5、灌胶:在环形箍板四周灌注粘钢胶,使环形箍板与被加固梁固定连接。本发明工序简单,通过以上做法可以达到对梁体加固的效果,并能够保证原有结构稳定性和安全性,使原有结构不发生破坏。
Beam cutting reinforcement construction method
一种切梁加固施工方法
YANG JIE (Autor:in) / ZHANG FENG (Autor:in) / LU QINGCHENG (Autor:in) / LI XINFENG (Autor:in) / RAO DAQUAN (Autor:in) / XIE JUN (Autor:in)
14.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
REINFORCEMENT BEAM FOR STRUCTURE, REINFORCEMENT CONSTRUCTION METHOD, AND STRUCTURE
Europäisches Patentamt | 2020
|PHC foundation reinforcement construction method using cutting PHC pile
Europäisches Patentamt | 2020
|BEAM END REINFORCEMENT STRUCTURE AND CONSTRUCTION METHOD
Europäisches Patentamt | 2023
|Platform beam main reinforcement reinforcing construction method
Europäisches Patentamt | 2020