Suspended ceiling transfer floor system of truss structure building and installation method of suspended ceiling transfer floor system
The invention discloses a suspended ceiling transfer layer system of a truss structure building and an installation method of the suspended ceiling transfer layer system. The suspended ceiling transfer layer system mainly comprises diagonal draw bars, steel keels and suspender assemblies. The two ends of the diagonal draw bar are detachably connected with the upper hoop assembly and the lower hoop assembly respectively. The steel keel comprises a main keel, and a secondary keel and an auxiliary keel which are sequentially arranged below the main keel; the upper hoop assembly is detachably installed on an upper frame pipe of the pipe truss, and the main keel is detachably installed through the lower hoop assembly. The secondary keels and the auxiliary keels are detachably assembled through the suspender assemblies. The system and the pipe truss and all structures in the system are detachably assembled, all structural parts can be machined and prefabricated in a factory and assembled on site through fasteners, installation is convenient, the installation error can be flexibly adjusted, and the overall flatness of the auxiliary keel for installing the decorative plate in the system after installation is guaranteed. The replacement is fast and simple; the measure cost is saved; the construction safety is greatly reduced; and the environment is protected, and the resource waste is reduced.
本发明公开了一种桁架结构建筑的吊顶转换层体系及其安装方法,吊顶转换层体系主要包括斜拉杆、钢龙骨和吊杆组件;斜拉杆的两端分别可拆卸连接上抱箍组件和下抱箍组件;钢龙骨包括主龙骨及依次布置于其下方的次龙骨和副龙骨;上抱箍组件可拆卸安装于管桁架的上架管上,主龙骨通过下抱箍组件可拆卸安装;次龙骨和副龙骨通过吊杆组件可拆卸装配。本体系与管桁架之间及体系内的各结构之间均为可拆卸装配,各结构件可先工厂加工预制,现场通过紧固件装配,不仅安装方便,还能灵活调整安装误差,保证安装后体系安装装饰板的副龙骨的整体平面度。减少施工周期、替换快捷简便、节省措施费用、施工安全大幅降低、环境保护减少资源浪费等优点。
Suspended ceiling transfer floor system of truss structure building and installation method of suspended ceiling transfer floor system
The invention discloses a suspended ceiling transfer layer system of a truss structure building and an installation method of the suspended ceiling transfer layer system. The suspended ceiling transfer layer system mainly comprises diagonal draw bars, steel keels and suspender assemblies. The two ends of the diagonal draw bar are detachably connected with the upper hoop assembly and the lower hoop assembly respectively. The steel keel comprises a main keel, and a secondary keel and an auxiliary keel which are sequentially arranged below the main keel; the upper hoop assembly is detachably installed on an upper frame pipe of the pipe truss, and the main keel is detachably installed through the lower hoop assembly. The secondary keels and the auxiliary keels are detachably assembled through the suspender assemblies. The system and the pipe truss and all structures in the system are detachably assembled, all structural parts can be machined and prefabricated in a factory and assembled on site through fasteners, installation is convenient, the installation error can be flexibly adjusted, and the overall flatness of the auxiliary keel for installing the decorative plate in the system after installation is guaranteed. The replacement is fast and simple; the measure cost is saved; the construction safety is greatly reduced; and the environment is protected, and the resource waste is reduced.
本发明公开了一种桁架结构建筑的吊顶转换层体系及其安装方法,吊顶转换层体系主要包括斜拉杆、钢龙骨和吊杆组件;斜拉杆的两端分别可拆卸连接上抱箍组件和下抱箍组件;钢龙骨包括主龙骨及依次布置于其下方的次龙骨和副龙骨;上抱箍组件可拆卸安装于管桁架的上架管上,主龙骨通过下抱箍组件可拆卸安装;次龙骨和副龙骨通过吊杆组件可拆卸装配。本体系与管桁架之间及体系内的各结构之间均为可拆卸装配,各结构件可先工厂加工预制,现场通过紧固件装配,不仅安装方便,还能灵活调整安装误差,保证安装后体系安装装饰板的副龙骨的整体平面度。减少施工周期、替换快捷简便、节省措施费用、施工安全大幅降低、环境保护减少资源浪费等优点。
Suspended ceiling transfer floor system of truss structure building and installation method of suspended ceiling transfer floor system
一种桁架结构建筑的吊顶转换层体系及其安装方法
HUANG YUMING (Autor:in) / ZHANG YANHUI (Autor:in) / XIE TENGYUN (Autor:in) / LIU YUFENG (Autor:in) / TAN XIAOCONG (Autor:in) / PAN JINYONG (Autor:in)
18.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Europäisches Patentamt | 2019
|Europäisches Patentamt | 2023
|Suspended ceiling installation component, suspended ceiling assembly and installation method thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|