Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Roadbed reinforcement treatment equipment for highway bridge construction
The invention relates to the technical field of roadbed reinforcement, and discloses roadbed reinforcement treatment equipment for highway bridge construction, the roadbed reinforcement treatment equipment comprises a bottom pipe and a top pipe, the top surface of the bottom pipe is sleeved with a matching disc, first vertical shafts are fixedly mounted on the two sides of the bottom surface of the top pipe, and the surfaces of the first vertical shafts are sleeved with pinch bars; and a central pipe is arranged in the top pipe. Through cooperation of structures such as the pinch bar, the center pipe and the sealing ball, in the process that the bottom pipe is inserted into a road surface hole and filling glue is injected, only when a worker uses the pinch bar and forcibly presses down, the matching disc can be tightly attached to the road surface to prevent the filling glue from overflowing, and the center pipe can be pried to move upwards; at the moment, the sealing ball in the central pipe is separated from the convex pipe, namely, the filling glue can be input into the road gap along the central pipe and the convex pipe, so that the gap in the road is filled.
本发明涉及路基加固技术领域,公开了一种公路桥梁施工用的路基加固处理设备,包括底部管和顶部管,所述底部管的顶部表面处套设有配合盘,所述顶部管的底部表面两侧均固定安装有第一立轴,所述第一立轴的表面套设有撬杆,所述顶部管的内部设置有中心管。本发明通过设置撬杆、中心管和密封球等结构的配合,从而在将该底部管插入路面孔洞内并注入填充胶过程中,只有工作人员使用撬杆并用力下压时,其配合盘可以紧密贴合在路面以防止填充胶溢出,并且中心管会被撬动上移,此时其中心管内部的密封球也就随之与凸起管分离,即填充胶可以顺着中心管和凸起管输入道路间隙中,以实现对道路中的间隙进行填充。
Roadbed reinforcement treatment equipment for highway bridge construction
The invention relates to the technical field of roadbed reinforcement, and discloses roadbed reinforcement treatment equipment for highway bridge construction, the roadbed reinforcement treatment equipment comprises a bottom pipe and a top pipe, the top surface of the bottom pipe is sleeved with a matching disc, first vertical shafts are fixedly mounted on the two sides of the bottom surface of the top pipe, and the surfaces of the first vertical shafts are sleeved with pinch bars; and a central pipe is arranged in the top pipe. Through cooperation of structures such as the pinch bar, the center pipe and the sealing ball, in the process that the bottom pipe is inserted into a road surface hole and filling glue is injected, only when a worker uses the pinch bar and forcibly presses down, the matching disc can be tightly attached to the road surface to prevent the filling glue from overflowing, and the center pipe can be pried to move upwards; at the moment, the sealing ball in the central pipe is separated from the convex pipe, namely, the filling glue can be input into the road gap along the central pipe and the convex pipe, so that the gap in the road is filled.
本发明涉及路基加固技术领域,公开了一种公路桥梁施工用的路基加固处理设备,包括底部管和顶部管,所述底部管的顶部表面处套设有配合盘,所述顶部管的底部表面两侧均固定安装有第一立轴,所述第一立轴的表面套设有撬杆,所述顶部管的内部设置有中心管。本发明通过设置撬杆、中心管和密封球等结构的配合,从而在将该底部管插入路面孔洞内并注入填充胶过程中,只有工作人员使用撬杆并用力下压时,其配合盘可以紧密贴合在路面以防止填充胶溢出,并且中心管会被撬动上移,此时其中心管内部的密封球也就随之与凸起管分离,即填充胶可以顺着中心管和凸起管输入道路间隙中,以实现对道路中的间隙进行填充。
Roadbed reinforcement treatment equipment for highway bridge construction
一种公路桥梁施工用的路基加固处理设备
CHANG RUIRUI (Autor:in) / WEI GONGBO (Autor:in) / TANG JINGWEN (Autor:in)
21.07.2023
Patent
Elektronische Ressource
Chinesisch
Roadbed tamping treatment equipment for highway construction
Europäisches Patentamt | 2024
|Highway bridge roadbed and pavement construction device
Europäisches Patentamt | 2020
|Roadbed construction equipment for highway engineering construction
Europäisches Patentamt | 2023
|