Basement exterior wall advanced water stop post-cast strip construction method
The invention discloses a basement exterior wall advanced water stop post-cast strip construction method which comprises the following construction steps: S1, building a basement exterior wall template (reserving a post-cast strip position), and outwards building a waterproof template at the reserved post-cast strip position; s2, concrete pouring is conducted on a basement outer wall formwork and a waterproof formwork, a basement outer wall and a waterproof wall are formed, and the basement outer wall formwork and the waterproof formwork are dismantled; s3, chiseling a construction joint between the basement outer wall and the advanced water-stop belt; s4, binding advanced waterstop reinforcing steel bars; s5, closing the mold of the post-cast strip; (S6); the method has the advantages that the precipitation cost is greatly reduced, the post-cast strip is prevented from being exposed for a long time, impurities and garbage of the post-cast strip are prevented from being accumulated, the later cleaning difficulty is increased, the construction quality of the post-cast strip is guaranteed, and the problem that subsequent construction is affected by water entering a basement is solved.
本发明公开了一种地下室外墙超前止水后浇带施工方法,包括以下施工步骤:S1:搭建地下室外墙模板(预留后浇带位置),并在预留后浇带位置向外搭建防水模板;S2:地下室外墙模板及防水模板砼浇筑,形成地下室外墙及防水墙,并拆除地下室外墙模板和防水模板;S3:地下室外墙与超前止水带间施工缝凿打;S4:绑扎超前止水带钢筋;S5:后浇带关模;S6;砼浇筑,完成后浇带浇筑,大大减少了降水费用,也防止了后浇带长时间暴露,造成后浇带杂物垃圾的堆积,增加后期清理难度,保证后浇带的施工质量避免了地下室进水影响后续施工等问题的发生。
Basement exterior wall advanced water stop post-cast strip construction method
The invention discloses a basement exterior wall advanced water stop post-cast strip construction method which comprises the following construction steps: S1, building a basement exterior wall template (reserving a post-cast strip position), and outwards building a waterproof template at the reserved post-cast strip position; s2, concrete pouring is conducted on a basement outer wall formwork and a waterproof formwork, a basement outer wall and a waterproof wall are formed, and the basement outer wall formwork and the waterproof formwork are dismantled; s3, chiseling a construction joint between the basement outer wall and the advanced water-stop belt; s4, binding advanced waterstop reinforcing steel bars; s5, closing the mold of the post-cast strip; (S6); the method has the advantages that the precipitation cost is greatly reduced, the post-cast strip is prevented from being exposed for a long time, impurities and garbage of the post-cast strip are prevented from being accumulated, the later cleaning difficulty is increased, the construction quality of the post-cast strip is guaranteed, and the problem that subsequent construction is affected by water entering a basement is solved.
本发明公开了一种地下室外墙超前止水后浇带施工方法,包括以下施工步骤:S1:搭建地下室外墙模板(预留后浇带位置),并在预留后浇带位置向外搭建防水模板;S2:地下室外墙模板及防水模板砼浇筑,形成地下室外墙及防水墙,并拆除地下室外墙模板和防水模板;S3:地下室外墙与超前止水带间施工缝凿打;S4:绑扎超前止水带钢筋;S5:后浇带关模;S6;砼浇筑,完成后浇带浇筑,大大减少了降水费用,也防止了后浇带长时间暴露,造成后浇带杂物垃圾的堆积,增加后期清理难度,保证后浇带的施工质量避免了地下室进水影响后续施工等问题的发生。
Basement exterior wall advanced water stop post-cast strip construction method
地下室外墙超前止水后浇带施工方法
WANG JINMING (Autor:in) / PAN LONG (Autor:in) / RAO YI (Autor:in)
21.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Construction method for closing basement exterior wall post-cast strip
Europäisches Patentamt | 2015
|Advanced water stop construction method and system for basement side wall post-cast strip
Europäisches Patentamt | 2023
|Basement exterior wall post-cast strip structure and construction method thereof
Europäisches Patentamt | 2021
|