Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Post-cast strip supporting frame body structure and construction method
The invention relates to a post-cast strip supporting frame body structure and a construction method, and belongs to the technical field of post-cast strip construction.The post-cast strip supporting frame body structure comprises three vertical pipes and a transverse rod, the three vertical pipes are arranged in a staggered mode, any two vertical pipes are connected through the transverse rod, and the transverse rod comprises two rod bodies and an adjusting assembly used for adjusting the distance between the two rod bodies; the adjusting assembly is located between the two sections of rod bodies, the ends, away from the adjusting assembly, of the two sections of rod bodies are connected with different vertical pipes, and supporting plates are arranged at the two ends of each vertical pipe and attached to a top plate or the ground. The post-cast strip construction method has the effect that the cost of turnover materials is reduced while the post-cast strip construction quality is not affected.
本申请涉及一种后浇带支撑架体结构及施工方法,属于后浇带施工的技术领域,其包括三根立管和横杆,三根立管交错设置,任意两根立管之间通过横杆连接,横杆包括两段杆体和用于调节两段杆体之间距离的调节组件,调节组件位于两段杆体之间,两段杆体远离调节组件的一端与不同的立管连接,立管的两端均设有支撑板,支撑板与顶板或地面贴合。本申请具有在不影响后浇带施工质量的同时降低周转材料的成本的效果。
Post-cast strip supporting frame body structure and construction method
The invention relates to a post-cast strip supporting frame body structure and a construction method, and belongs to the technical field of post-cast strip construction.The post-cast strip supporting frame body structure comprises three vertical pipes and a transverse rod, the three vertical pipes are arranged in a staggered mode, any two vertical pipes are connected through the transverse rod, and the transverse rod comprises two rod bodies and an adjusting assembly used for adjusting the distance between the two rod bodies; the adjusting assembly is located between the two sections of rod bodies, the ends, away from the adjusting assembly, of the two sections of rod bodies are connected with different vertical pipes, and supporting plates are arranged at the two ends of each vertical pipe and attached to a top plate or the ground. The post-cast strip construction method has the effect that the cost of turnover materials is reduced while the post-cast strip construction quality is not affected.
本申请涉及一种后浇带支撑架体结构及施工方法,属于后浇带施工的技术领域,其包括三根立管和横杆,三根立管交错设置,任意两根立管之间通过横杆连接,横杆包括两段杆体和用于调节两段杆体之间距离的调节组件,调节组件位于两段杆体之间,两段杆体远离调节组件的一端与不同的立管连接,立管的两端均设有支撑板,支撑板与顶板或地面贴合。本申请具有在不影响后浇带施工质量的同时降低周转材料的成本的效果。
Post-cast strip supporting frame body structure and construction method
一种后浇带支撑架体结构及施工方法
LIU HUI (Autor:in) / CHEN ZHONGZHU (Autor:in) / LIU PENGFEI (Autor:in) / XIE WANG (Autor:in) / ZHANG JING (Autor:in)
21.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2022
|Post-cast strip supporting structure and construction method
Europäisches Patentamt | 2024
|Post-cast strip supporting structure and construction method thereof
Europäisches Patentamt | 2022
|Post-cast strip galvanized steel pipe supporting frame back-jacking construction method
Europäisches Patentamt | 2022
|Built-in supporting frame of post-cast strip for building construction
Europäisches Patentamt | 2023
|