Special-shaped main tower construction section concrete winter curing method
The invention discloses a special-shaped main tower construction section concrete winter curing method which is used for a creeping formwork device and comprises the steps that a formwork outer heat preservation body is arranged on the outer side of the creeping formwork device; all construction sections are sequentially installed above the lower tower column in a segmental mode; a heat preservation shed frame is erected on the top of the construction section; the upper portion of the formwork outer thermal insulation body is covered with the thermal insulation shed frame, and the construction segment is wrapped; concrete is poured into the construction sections; and steam curing is conducted on an inner box chamber of the concrete in the construction section, so that winter curing is conducted on the concrete of the construction section of the special-shaped main tower. By means of the heat preservation shed frame and the formwork outer heat preservation body on the creeping formwork device, steam curing is carried out on the initially-set concrete, the quality problems such as freezing expansion, cracks and structural diseases of the concrete are prevented, the forming strength of the concrete is guaranteed, and the winter construction quality of the main tower concrete is guaranteed.
本发明公开了一种异形主塔施工节段混凝土冬季养护方法,用于爬模装置,所述方法包括:在所述爬模装置的外侧设置模板外保温体;在所述下塔柱的上方分节段依次安装各施工节段;在所述施工节段的顶部搭设保温棚架;将所述保温棚架覆盖于所述模板外保温体的上方,将所述施工节段包覆;向所述施工节段浇筑混凝土;对所述施工节段中混凝土的内箱室进行蒸汽养生,以对所述异形主塔施工节段的混凝土进行冬季养护。本发明通过保温棚架与爬模装置上的模板外保温体,对初凝后的混凝土进行蒸汽养生,防止混凝土发生冻涨、裂纹、结构病害等质量问题,保障混凝土的成型强度,确保了主塔混凝土的冬期施工质量。
Special-shaped main tower construction section concrete winter curing method
The invention discloses a special-shaped main tower construction section concrete winter curing method which is used for a creeping formwork device and comprises the steps that a formwork outer heat preservation body is arranged on the outer side of the creeping formwork device; all construction sections are sequentially installed above the lower tower column in a segmental mode; a heat preservation shed frame is erected on the top of the construction section; the upper portion of the formwork outer thermal insulation body is covered with the thermal insulation shed frame, and the construction segment is wrapped; concrete is poured into the construction sections; and steam curing is conducted on an inner box chamber of the concrete in the construction section, so that winter curing is conducted on the concrete of the construction section of the special-shaped main tower. By means of the heat preservation shed frame and the formwork outer heat preservation body on the creeping formwork device, steam curing is carried out on the initially-set concrete, the quality problems such as freezing expansion, cracks and structural diseases of the concrete are prevented, the forming strength of the concrete is guaranteed, and the winter construction quality of the main tower concrete is guaranteed.
本发明公开了一种异形主塔施工节段混凝土冬季养护方法,用于爬模装置,所述方法包括:在所述爬模装置的外侧设置模板外保温体;在所述下塔柱的上方分节段依次安装各施工节段;在所述施工节段的顶部搭设保温棚架;将所述保温棚架覆盖于所述模板外保温体的上方,将所述施工节段包覆;向所述施工节段浇筑混凝土;对所述施工节段中混凝土的内箱室进行蒸汽养生,以对所述异形主塔施工节段的混凝土进行冬季养护。本发明通过保温棚架与爬模装置上的模板外保温体,对初凝后的混凝土进行蒸汽养生,防止混凝土发生冻涨、裂纹、结构病害等质量问题,保障混凝土的成型强度,确保了主塔混凝土的冬期施工质量。
Special-shaped main tower construction section concrete winter curing method
异形主塔施工节段混凝土冬季养护方法
CHANG YUNCHAO (Autor:in) / ZHU JIANFENG (Autor:in) / LIU ZHONG (Autor:in) / SUN SHULIANG (Autor:in) / SUN QUANYONG (Autor:in) / DUAN FENG (Autor:in) / KANG SHIZUN (Autor:in) / HOU HONGJIANG (Autor:in) / LI ZHAOKUN (Autor:in) / ZHU SIHAI (Autor:in)
25.07.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Special-shaped concrete column curing device on construction site
Europäisches Patentamt | 2023
|