Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated well chamber structure and construction method thereof
The invention relates to a prefabricated well chamber structure and a construction method thereof.The prefabricated well chamber structure comprises a prefabricated well lid base arranged at a well opening and a well lid body arranged on the prefabricated well lid base; the prefabricated well lid base comprises a well base ring, a fixed supporting ring fixedly connected to the lower portion of the inner circumferential wall of the well base ring and a movable supporting ring which is connected with the well base ring in a sliding mode in the vertical direction and located above the fixed supporting ring, and the fixed supporting ring is provided with an adjusting mechanism for adjusting the sliding position of the movable supporting ring. The well lid body comprises a well lid ring, an inserting convex ring fixedly connected to the lower end face of the well lid ring to be inserted into the well seat ring and a well lid plate hinged to the well lid ring to seal a through opening of the well lid ring, and the lower end face of the inserting convex ring abuts against the upper end face of the movable supporting ring. The method has the effect of shortening the well lid renovation construction time.
本申请涉及一种预制井室结构及其施工方法,一种预制井室结构,包括包括设置于井道口的预制井盖座以及设置于预制井盖座的井盖本体,所述预制井盖座包括井座圈、固定连接于井座圈内周壁下部的固定支撑圈以及沿竖向滑移连井座圈且位于固定支撑圈上方的活动支撑圈,所述固定支撑圈设置有调节活动支撑圈滑移位置的调节机构,所述井盖本体包括井盖圈、固定连接于井盖圈下端面以插设于井座圈的插接凸环以及铰接于井盖圈以对井盖圈的通口进行封闭的井盖板,插接凸环的下端面抵接于活动支撑圈的上端面。本申请具有缩短井盖翻新施工时间的效果。
Prefabricated well chamber structure and construction method thereof
The invention relates to a prefabricated well chamber structure and a construction method thereof.The prefabricated well chamber structure comprises a prefabricated well lid base arranged at a well opening and a well lid body arranged on the prefabricated well lid base; the prefabricated well lid base comprises a well base ring, a fixed supporting ring fixedly connected to the lower portion of the inner circumferential wall of the well base ring and a movable supporting ring which is connected with the well base ring in a sliding mode in the vertical direction and located above the fixed supporting ring, and the fixed supporting ring is provided with an adjusting mechanism for adjusting the sliding position of the movable supporting ring. The well lid body comprises a well lid ring, an inserting convex ring fixedly connected to the lower end face of the well lid ring to be inserted into the well seat ring and a well lid plate hinged to the well lid ring to seal a through opening of the well lid ring, and the lower end face of the inserting convex ring abuts against the upper end face of the movable supporting ring. The method has the effect of shortening the well lid renovation construction time.
本申请涉及一种预制井室结构及其施工方法,一种预制井室结构,包括包括设置于井道口的预制井盖座以及设置于预制井盖座的井盖本体,所述预制井盖座包括井座圈、固定连接于井座圈内周壁下部的固定支撑圈以及沿竖向滑移连井座圈且位于固定支撑圈上方的活动支撑圈,所述固定支撑圈设置有调节活动支撑圈滑移位置的调节机构,所述井盖本体包括井盖圈、固定连接于井盖圈下端面以插设于井座圈的插接凸环以及铰接于井盖圈以对井盖圈的通口进行封闭的井盖板,插接凸环的下端面抵接于活动支撑圈的上端面。本申请具有缩短井盖翻新施工时间的效果。
Prefabricated well chamber structure and construction method thereof
一种预制井室结构及其施工方法
FENG HUANG (Autor:in) / JIANG YUHAN (Autor:in)
25.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2021
|Prefabricated well wall brick structure for well and construction method thereof
Europäisches Patentamt | 2021
|Prefabricated inspection well and construction method thereof
Europäisches Patentamt | 2015
|Prefabricated inspection well and construction method thereof
Europäisches Patentamt | 2020
|Prefabricated concrete well internode connecting structure and construction method thereof
Europäisches Patentamt | 2024
|