Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a building construction guardrail structure, and relates to the technical field of building construction, the building construction guardrail structure comprises a first base assembly, two second base assemblies are symmetrically arranged on the two sides of the first base assembly, and a storage assembly is connected to the top end of the first base assembly; two moving assemblies are symmetrically mounted at the top ends of the two second base assemblies, a first guardrail assembly and a second guardrail assembly are jointly connected between the storage assembly and each moving assembly, the structures of the first guardrail assembly and the second guardrail assembly are the same, and the storage assembly comprises a front shell and a rear shell. The front shell is located on the front side of the rear shell, by arranging the front shell, the rear shell, the front supporting column, the rear supporting column, the first guardrail assembly and the second guardrail assembly, a screw can drive the rear shell, the second guardrail assembly and the rear supporting column to move upwards according to the height of an area, needing to be intercepted, of a construction site, and then the interception height of the guardrail is increased; and the use is relatively convenient.
本发明公开了一种建筑施工护栏结构,本发明涉及建筑施工技术领域,包括第一底座组件,所述第一底座组件的两侧对称设置有两组第二底座组件,所述第一底座组件的顶端连接有收纳组件,两组所述第二底座组件的顶端对称安装有两组移动组件,所述收纳组件和每组移动组件之间共同连接有第一护栏组件和第二护栏组件,且第一护栏组件和第二护栏组件的结构相同,所述收纳组件包括前壳体和后壳体,所述前壳体位于后壳体的前侧,通过设置前壳体、后壳体、前支柱、后支柱以及第一护栏组件和第二护栏组件使得可根据建筑工地所需拦截的区域高度使的螺杆带动后壳体、第二护栏组件和后支柱向上移动,进而增加护栏的拦截高度,且使用较为便捷。
The invention discloses a building construction guardrail structure, and relates to the technical field of building construction, the building construction guardrail structure comprises a first base assembly, two second base assemblies are symmetrically arranged on the two sides of the first base assembly, and a storage assembly is connected to the top end of the first base assembly; two moving assemblies are symmetrically mounted at the top ends of the two second base assemblies, a first guardrail assembly and a second guardrail assembly are jointly connected between the storage assembly and each moving assembly, the structures of the first guardrail assembly and the second guardrail assembly are the same, and the storage assembly comprises a front shell and a rear shell. The front shell is located on the front side of the rear shell, by arranging the front shell, the rear shell, the front supporting column, the rear supporting column, the first guardrail assembly and the second guardrail assembly, a screw can drive the rear shell, the second guardrail assembly and the rear supporting column to move upwards according to the height of an area, needing to be intercepted, of a construction site, and then the interception height of the guardrail is increased; and the use is relatively convenient.
本发明公开了一种建筑施工护栏结构,本发明涉及建筑施工技术领域,包括第一底座组件,所述第一底座组件的两侧对称设置有两组第二底座组件,所述第一底座组件的顶端连接有收纳组件,两组所述第二底座组件的顶端对称安装有两组移动组件,所述收纳组件和每组移动组件之间共同连接有第一护栏组件和第二护栏组件,且第一护栏组件和第二护栏组件的结构相同,所述收纳组件包括前壳体和后壳体,所述前壳体位于后壳体的前侧,通过设置前壳体、后壳体、前支柱、后支柱以及第一护栏组件和第二护栏组件使得可根据建筑工地所需拦截的区域高度使的螺杆带动后壳体、第二护栏组件和后支柱向上移动,进而增加护栏的拦截高度,且使用较为便捷。
Building construction guardrail structure
一种建筑施工护栏结构
REN LIPENG (Autor:in)
25.07.2023
Patent
Elektronische Ressource
Chinesisch