Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Urban pipe gallery
The invention discloses an urban pipe gallery, and relates to the field of pipe gallery construction, the urban pipe gallery comprises M sets of pipe gallery splicing units, the M sets of pipe gallery splicing units are spliced in sequence from front to back, each pipe gallery splicing unit comprises a prefabricated pipe, an inner pipe and a temporary supporting layer arranged on the outermost side, and the prefabricated pipe is arranged in the temporary supporting layer in an internally cut mode; the tunnel is excavated through the tunneling machine, the temporary supporting layer is arranged in the tunneling process, temporary reinforcing measures are taken on the tunneling working face, and therefore follow-up work development is guaranteed; the prefabricated pipe and the inner pipeline are quickly assembled, the strength of a main body structure is ensured, meanwhile, the protective measures such as shock prevention and water prevention are achieved, the construction period is shortened, the pipe gallery construction efficiency is improved, and meanwhile the requirements for economical efficiency and reliability of construction are met.
本发明公开了一种城市管廊,涉及管廊施工领域,包括M组管廊拼接单元,M组管廊拼接单元从前往后依次拼接,管廊拼接单元包括预制管、内管道以及设置在最外侧的临时支护层,预制管内切设置在临时支护层内,预制管的外表面与临时支护层的空隙处填充混凝土形成填充层,本发明通过掘进机开凿巷道,并在掘进过程中设置临时支护层,对掘进工作面做临时加固措施,以保证我们后续工作的开展,通过采用预制模式,利用预制管和内管道进行快速拼装,确保主体结构强度,同时具有防震、防水等防护措施,在缩短施工周期,提高管廊施工效率的同时,满足施工的经济性和可靠性需求。
Urban pipe gallery
The invention discloses an urban pipe gallery, and relates to the field of pipe gallery construction, the urban pipe gallery comprises M sets of pipe gallery splicing units, the M sets of pipe gallery splicing units are spliced in sequence from front to back, each pipe gallery splicing unit comprises a prefabricated pipe, an inner pipe and a temporary supporting layer arranged on the outermost side, and the prefabricated pipe is arranged in the temporary supporting layer in an internally cut mode; the tunnel is excavated through the tunneling machine, the temporary supporting layer is arranged in the tunneling process, temporary reinforcing measures are taken on the tunneling working face, and therefore follow-up work development is guaranteed; the prefabricated pipe and the inner pipeline are quickly assembled, the strength of a main body structure is ensured, meanwhile, the protective measures such as shock prevention and water prevention are achieved, the construction period is shortened, the pipe gallery construction efficiency is improved, and meanwhile the requirements for economical efficiency and reliability of construction are met.
本发明公开了一种城市管廊,涉及管廊施工领域,包括M组管廊拼接单元,M组管廊拼接单元从前往后依次拼接,管廊拼接单元包括预制管、内管道以及设置在最外侧的临时支护层,预制管内切设置在临时支护层内,预制管的外表面与临时支护层的空隙处填充混凝土形成填充层,本发明通过掘进机开凿巷道,并在掘进过程中设置临时支护层,对掘进工作面做临时加固措施,以保证我们后续工作的开展,通过采用预制模式,利用预制管和内管道进行快速拼装,确保主体结构强度,同时具有防震、防水等防护措施,在缩短施工周期,提高管廊施工效率的同时,满足施工的经济性和可靠性需求。
Urban pipe gallery
一种城市管廊
LI LEI (Autor:in) / QI JINGJING (Autor:in) / WANG PEI (Autor:in)
28.07.2023
Patent
Elektronische Ressource
Chinesisch