Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated part of bridge deck slab and connecting structure for bridge deck slab field assembly
The invention relates to a prefabricated part of a bridge deck slab and a connecting structure for field assembly of the bridge deck slab, and belongs to the technical field of bridges, the prefabricated part comprises a plurality of panel modules, the panel modules are formed by pouring UHPC materials, the panel modules comprise two side blocks and a middle block, and the middle block is arranged between the two side blocks. First through holes are formed in the opposite side walls of the two edge blocks in a penetrating mode, second through holes are formed in the side walls, on one sides of the first through holes, of the edge blocks in a penetrating mode, the middle block is arranged between the two edge blocks, third through holes are formed in the side walls, facing the edge blocks, of the middle block in a penetrating mode, and the third through holes are aligned to the first through holes; fourth through holes are formed in the positions, on the side walls of one sides of the third through holes, of the two middle blocks in a penetrating mode, the fourth through holes are aligned with the second through holes, and the effects that the influence of weather on construction is reduced, and the construction period is shortened are achieved.
本申请涉及一种桥梁桥面板的预制件及桥面板现场拼装的连接结构,属于桥梁的技术领域,其包括面板模块,面板模块为UHPC材料浇筑而成,面板模块设置有若干个,面板模块包括边块和中间块,边块设置有两个,两个边块相背离的侧壁均贯穿开设有第一通孔,边块在第一通孔一侧的侧壁贯穿开设有第二通孔,中间块设置在两个边块之间,中间块朝向边块的侧壁贯穿开设有第三通孔,第三通孔与第一通孔相对齐,中间块两个在第三通孔一侧的侧壁贯穿开设有第四通孔,第四通孔与第二通孔相对齐,本申请具有减小天气对施工的影响并缩短施工周期的效果。
Prefabricated part of bridge deck slab and connecting structure for bridge deck slab field assembly
The invention relates to a prefabricated part of a bridge deck slab and a connecting structure for field assembly of the bridge deck slab, and belongs to the technical field of bridges, the prefabricated part comprises a plurality of panel modules, the panel modules are formed by pouring UHPC materials, the panel modules comprise two side blocks and a middle block, and the middle block is arranged between the two side blocks. First through holes are formed in the opposite side walls of the two edge blocks in a penetrating mode, second through holes are formed in the side walls, on one sides of the first through holes, of the edge blocks in a penetrating mode, the middle block is arranged between the two edge blocks, third through holes are formed in the side walls, facing the edge blocks, of the middle block in a penetrating mode, and the third through holes are aligned to the first through holes; fourth through holes are formed in the positions, on the side walls of one sides of the third through holes, of the two middle blocks in a penetrating mode, the fourth through holes are aligned with the second through holes, and the effects that the influence of weather on construction is reduced, and the construction period is shortened are achieved.
本申请涉及一种桥梁桥面板的预制件及桥面板现场拼装的连接结构,属于桥梁的技术领域,其包括面板模块,面板模块为UHPC材料浇筑而成,面板模块设置有若干个,面板模块包括边块和中间块,边块设置有两个,两个边块相背离的侧壁均贯穿开设有第一通孔,边块在第一通孔一侧的侧壁贯穿开设有第二通孔,中间块设置在两个边块之间,中间块朝向边块的侧壁贯穿开设有第三通孔,第三通孔与第一通孔相对齐,中间块两个在第三通孔一侧的侧壁贯穿开设有第四通孔,第四通孔与第二通孔相对齐,本申请具有减小天气对施工的影响并缩短施工周期的效果。
Prefabricated part of bridge deck slab and connecting structure for bridge deck slab field assembly
一种桥梁桥面板的预制件及桥面板现场拼装的连接结构
LI XIAOLONG (Autor:in) / REN CHENGCHUAN (Autor:in) / CHEN HUI (Autor:in) / YING WEIQIANG (Autor:in) / JI XIANKUN (Autor:in) / ZHANG SHUAIJUN (Autor:in) / WANG ZHONGQIANG (Autor:in) / MA HAICHUN (Autor:in) / WEI SHUHAO (Autor:in)
01.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Prefabricated bridge deck slab wet joint connecting structure, prefabricated bridge and method
Europäisches Patentamt | 2020
|