Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Modular temporary plugging wall of underground main body structure and construction method of modular temporary plugging wall
The invention discloses a modular temporary plugging wall of an underground main body structure and a construction method thereof, and the plugging wall comprises connection steel bars which are arranged at the port of the underground main body structure and are used for assisting in reinforcing and positioning the whole structure of the plugging wall; the prefabricated concrete module comprises a square module main body, a module interconnection mechanism, an embedded handle, a reinforcing rib plate and a water stop unit; the module interconnection mechanism comprises grooves formed in the periphery of the module body, connection steel bars fixedly connected with the module body, and interconnection assemblies used for mutual connection of the connection steel bars between the modules, wherein the ends of the connection steel bars extend into the grooves. The temporary plugging wall is formed by splicing modular prefabricated concrete structures, the technical problem that a traditional retaining wall needs to be broken through large mechanical equipment, and consequently an embedded component and a waterproof layer are damaged is effectively solved, the construction safety is enhanced, the structure connection quality is guaranteed, meanwhile, the detachable module sets can be repeatedly used, and the construction cost is reduced. The green and environment-friendly effects are realized.
本发明公开了一种地下主体结构模块式临时封堵墙及其施工方法,封堵墙包括:设于地下主体结构端口处的接驳钢筋,用于辅助加强定位封堵墙整体结构;预制混凝土模块,其包括方形模块主体、模块互联机构、预埋把手、加强筋肋板、止水单元;所述模块互联机构,包括开设于所述模块主体四周的凹槽、与模块主体固定连接且端部伸长至所述凹槽内的接驳钢筋、用于模块间接驳钢筋相互连接的互联组件;通过采用模块式预制混凝土结构拼装形成临时封堵墙,有效解决了传统挡土墙需要使用大型机械设备破除,造成预埋构件及防水层造成破坏的技术问题,增强了施工的安全性,保证了结构接驳质量,同时可拆卸式模块组可实现重复利用,兼具绿色环保的效果。
Modular temporary plugging wall of underground main body structure and construction method of modular temporary plugging wall
The invention discloses a modular temporary plugging wall of an underground main body structure and a construction method thereof, and the plugging wall comprises connection steel bars which are arranged at the port of the underground main body structure and are used for assisting in reinforcing and positioning the whole structure of the plugging wall; the prefabricated concrete module comprises a square module main body, a module interconnection mechanism, an embedded handle, a reinforcing rib plate and a water stop unit; the module interconnection mechanism comprises grooves formed in the periphery of the module body, connection steel bars fixedly connected with the module body, and interconnection assemblies used for mutual connection of the connection steel bars between the modules, wherein the ends of the connection steel bars extend into the grooves. The temporary plugging wall is formed by splicing modular prefabricated concrete structures, the technical problem that a traditional retaining wall needs to be broken through large mechanical equipment, and consequently an embedded component and a waterproof layer are damaged is effectively solved, the construction safety is enhanced, the structure connection quality is guaranteed, meanwhile, the detachable module sets can be repeatedly used, and the construction cost is reduced. The green and environment-friendly effects are realized.
本发明公开了一种地下主体结构模块式临时封堵墙及其施工方法,封堵墙包括:设于地下主体结构端口处的接驳钢筋,用于辅助加强定位封堵墙整体结构;预制混凝土模块,其包括方形模块主体、模块互联机构、预埋把手、加强筋肋板、止水单元;所述模块互联机构,包括开设于所述模块主体四周的凹槽、与模块主体固定连接且端部伸长至所述凹槽内的接驳钢筋、用于模块间接驳钢筋相互连接的互联组件;通过采用模块式预制混凝土结构拼装形成临时封堵墙,有效解决了传统挡土墙需要使用大型机械设备破除,造成预埋构件及防水层造成破坏的技术问题,增强了施工的安全性,保证了结构接驳质量,同时可拆卸式模块组可实现重复利用,兼具绿色环保的效果。
Modular temporary plugging wall of underground main body structure and construction method of modular temporary plugging wall
一种地下主体结构模块式临时封堵墙及其施工方法
JIANG RONGWEI (Autor:in) / HU XINQI (Autor:in) / NIE MINGMING (Autor:in)
01.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Inflation assembly type plugging piece for temporary plugging and plugging wall structure
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Permanent and temporary combined fabricated plugging wall structure and construction method
Europäisches Patentamt | 2023
|Temporary plugging gate and temporary plugging method of sewage pipeline
Europäisches Patentamt | 2020
|