Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cultural relic translation and track recycling
The invention relates to the technical field of cultural relic translation, and discloses cultural relic translation and track cyclic utilization which comprises a first Larsen steel sheet pile, reinforcing steel bars are welded in the first Larsen steel sheet pile, a rolling shaft assembly is welded to the tops of the reinforcing steel bars, and a sliding rail is arranged at the bottom of the first Larsen steel sheet pile. According to the cultural relic translation and track cyclic utilization, the jack is used for jacking the second Larsen steel sheet piles on the top into the bottom of a dam, then the third Larsen steel sheet piles are clamped to the tops of the two second Larsen steel sheet piles, and operation is conducted in sequence, so that the upper portion and the lower portion of the dam are integrally cut off; jacks are used for jacking, so that the second Larsen steel sheet pile and the third Larsen steel sheet pile drive the dam to slide on the top of the rolling shaft assembly, and after the dam moves forwards by a certain distance, the first Larsen steel sheet pile on the lower portion can be moved to the advancing direction to be used as a new track. And the cost can be effectively saved by cyclically utilizing and moving the first Larsen steel sheet pile.
本发明涉及文物平移技术领域,且公开了文物平移及轨道循环利用,包括第一拉森钢板桩,所述第一拉森钢板桩的内部焊接有钢筋,所述钢筋的顶部焊接有滚轴组件,所述第一拉森钢板桩的底部设有滑轨,所述滑轨的内部固定连接有固定套环,该文物平移及轨道循环利用,使用千斤顶将顶部的第二拉森钢板桩顶入到堤坝的底部,再将第三拉森钢板桩卡在两个第二拉森钢板桩的顶部,依次操作,使得堤坝上下部位整体被切断,利用千斤顶进行顶压,使得第二拉森钢板桩和第三拉森钢板桩带动堤坝在滚轴组件的顶部滑移,堤坝前移一定距离后可以将下部的第一拉森钢板桩移动到前进方向上作为新的轨道使用,循环利用移动第一拉森钢板桩可以有效的节约成本。
Cultural relic translation and track recycling
The invention relates to the technical field of cultural relic translation, and discloses cultural relic translation and track cyclic utilization which comprises a first Larsen steel sheet pile, reinforcing steel bars are welded in the first Larsen steel sheet pile, a rolling shaft assembly is welded to the tops of the reinforcing steel bars, and a sliding rail is arranged at the bottom of the first Larsen steel sheet pile. According to the cultural relic translation and track cyclic utilization, the jack is used for jacking the second Larsen steel sheet piles on the top into the bottom of a dam, then the third Larsen steel sheet piles are clamped to the tops of the two second Larsen steel sheet piles, and operation is conducted in sequence, so that the upper portion and the lower portion of the dam are integrally cut off; jacks are used for jacking, so that the second Larsen steel sheet pile and the third Larsen steel sheet pile drive the dam to slide on the top of the rolling shaft assembly, and after the dam moves forwards by a certain distance, the first Larsen steel sheet pile on the lower portion can be moved to the advancing direction to be used as a new track. And the cost can be effectively saved by cyclically utilizing and moving the first Larsen steel sheet pile.
本发明涉及文物平移技术领域,且公开了文物平移及轨道循环利用,包括第一拉森钢板桩,所述第一拉森钢板桩的内部焊接有钢筋,所述钢筋的顶部焊接有滚轴组件,所述第一拉森钢板桩的底部设有滑轨,所述滑轨的内部固定连接有固定套环,该文物平移及轨道循环利用,使用千斤顶将顶部的第二拉森钢板桩顶入到堤坝的底部,再将第三拉森钢板桩卡在两个第二拉森钢板桩的顶部,依次操作,使得堤坝上下部位整体被切断,利用千斤顶进行顶压,使得第二拉森钢板桩和第三拉森钢板桩带动堤坝在滚轴组件的顶部滑移,堤坝前移一定距离后可以将下部的第一拉森钢板桩移动到前进方向上作为新的轨道使用,循环利用移动第一拉森钢板桩可以有效的节约成本。
Cultural relic translation and track recycling
文物平移及轨道循环利用
YANG SHANWEN (Autor:in) / WANG HAO (Autor:in) / DING BO (Autor:in)
04.08.2023
Patent
Elektronische Ressource
Chinesisch
Nonmetal cultural relic electrochemical protection method
Europäisches Patentamt | 2021
|