Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stacking and discharging platform construction and drainage construction method of hillside dumping site
The invention discloses a piling and discharging platform construction and drainage construction method for a hillside dumping site, which comprises the following steps of: 1, cleaning the surface of a foundation at the hillside dumping site to obtain a stable foundation of the hillside dumping site; 2, excavating on the stable foundation of the hillside dumping site to form a peripheral water intercepting and draining ditch; thirdly, a piling and dumping platform of the hillside dumping site is constructed; and 4, performing drainage construction on the hillside dumping site. The design is reasonable, the cost is low, the waste dump platform construction process and the waste dump drainage system are combined, catchment of the waste dump platform is intensively discharged out of the waste dump, and safety and stability of the waste dump are guaranteed; and meanwhile, platform catchment water is decelerated, silt is filtered, the ecological environment is protected, and water and soil loss is prevented.
本发明公开了一种山坡排土场的堆排平台构筑及排水施工方法,该方法包括以下步骤:一、对山坡排土场所处的地基进行清表,得到山坡排土场稳定地基;二、在山坡排土场稳定地基上开挖形成外围截排水沟;三、山坡排土场的堆排平台构筑;四、山坡排土场的排水施工。本发明设计合理且成本低,将排土场平台构筑工艺与排土场排水系统结合,不仅将排土平台的汇水集中排出排土场,确保了排土场的安全稳定;同时对平台汇水进行减速及泥沙过滤,保护了生态环境,防止了水土流失。
Stacking and discharging platform construction and drainage construction method of hillside dumping site
The invention discloses a piling and discharging platform construction and drainage construction method for a hillside dumping site, which comprises the following steps of: 1, cleaning the surface of a foundation at the hillside dumping site to obtain a stable foundation of the hillside dumping site; 2, excavating on the stable foundation of the hillside dumping site to form a peripheral water intercepting and draining ditch; thirdly, a piling and dumping platform of the hillside dumping site is constructed; and 4, performing drainage construction on the hillside dumping site. The design is reasonable, the cost is low, the waste dump platform construction process and the waste dump drainage system are combined, catchment of the waste dump platform is intensively discharged out of the waste dump, and safety and stability of the waste dump are guaranteed; and meanwhile, platform catchment water is decelerated, silt is filtered, the ecological environment is protected, and water and soil loss is prevented.
本发明公开了一种山坡排土场的堆排平台构筑及排水施工方法,该方法包括以下步骤:一、对山坡排土场所处的地基进行清表,得到山坡排土场稳定地基;二、在山坡排土场稳定地基上开挖形成外围截排水沟;三、山坡排土场的堆排平台构筑;四、山坡排土场的排水施工。本发明设计合理且成本低,将排土场平台构筑工艺与排土场排水系统结合,不仅将排土平台的汇水集中排出排土场,确保了排土场的安全稳定;同时对平台汇水进行减速及泥沙过滤,保护了生态环境,防止了水土流失。
Stacking and discharging platform construction and drainage construction method of hillside dumping site
一种山坡排土场的堆排平台构筑及排水施工方法
LIU YUANYUAN (Autor:in) / LIU LONGTAO (Autor:in) / REN BO (Autor:in) / YANG SHENGWEI (Autor:in)
04.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for drainage system of dumping site outside strip mine
Europäisches Patentamt | 2021
|Hillside building : design and construction
TIBKAT | 1991
|Construction structure and construction method of gully dumping site
Europäisches Patentamt | 2022
|