Mine geological environment treatment method
The invention discloses a mine geological environment treatment method. The method comprises the following steps of 1, building; step 2, laying; step 3, mounting; step 4, watering; step 5, stirring; step 6, spraying; step 7, maintenance; wherein in the first step, drainage channels are built at the bottoms of the large-angle slope and the small-angle slope of the mine, the drainage channels are communicated with the rainwater collecting pool, an end cover is placed at the top of each drainage channel, through holes are evenly formed in each end cover, and a retaining wall is built at the front edge of the large-angle slope body; according to the invention, the steel wire mesh is arranged on the large-angle slope, so that the hillstone is conveniently fixed, the rolling rate of the hillstone is reduced, the plant straw mesh is laid, and planting slurry is sprayed on the plant straw mesh, so that the planting slurry is prevented from sliding off, and meanwhile, certain nutrients are provided for planting plants by utilizing natural decay of plant straws, so that the planting efficiency is improved. Therefore, the survival rate of the plants is improved, and the cost required by treatment is reduced.
本发明公开了一种矿山地质环境治理方法,包括以下步骤:步骤一,修建;步骤二,铺设;步骤三,安装;步骤四,洒水;步骤五,搅拌;步骤六,喷涂;步骤七,养护;其中在上述步骤一中,在矿山的大角度斜坡以及小角度斜坡底部修建排水渠,并且将排水渠连通在雨水收集池中,在排水渠的顶部放置有端盖,且端盖上均匀的设置有通孔,在大角度斜坡体前缘修建挡土墙;该发明,通过在大角度斜坡上设置有钢丝网,便于对山石进行固定,降低了山石的滚落率,且铺设有植物秸秆网,通过将种植泥浆喷涂在植物秸秆网上,避免了种植泥浆的滑落,同时利用植物秸秆的自然腐烂为种植植物提供了一定的养分,从而提高了植物的存活率,进而降低了治理所需的费用。
Mine geological environment treatment method
The invention discloses a mine geological environment treatment method. The method comprises the following steps of 1, building; step 2, laying; step 3, mounting; step 4, watering; step 5, stirring; step 6, spraying; step 7, maintenance; wherein in the first step, drainage channels are built at the bottoms of the large-angle slope and the small-angle slope of the mine, the drainage channels are communicated with the rainwater collecting pool, an end cover is placed at the top of each drainage channel, through holes are evenly formed in each end cover, and a retaining wall is built at the front edge of the large-angle slope body; according to the invention, the steel wire mesh is arranged on the large-angle slope, so that the hillstone is conveniently fixed, the rolling rate of the hillstone is reduced, the plant straw mesh is laid, and planting slurry is sprayed on the plant straw mesh, so that the planting slurry is prevented from sliding off, and meanwhile, certain nutrients are provided for planting plants by utilizing natural decay of plant straws, so that the planting efficiency is improved. Therefore, the survival rate of the plants is improved, and the cost required by treatment is reduced.
本发明公开了一种矿山地质环境治理方法,包括以下步骤:步骤一,修建;步骤二,铺设;步骤三,安装;步骤四,洒水;步骤五,搅拌;步骤六,喷涂;步骤七,养护;其中在上述步骤一中,在矿山的大角度斜坡以及小角度斜坡底部修建排水渠,并且将排水渠连通在雨水收集池中,在排水渠的顶部放置有端盖,且端盖上均匀的设置有通孔,在大角度斜坡体前缘修建挡土墙;该发明,通过在大角度斜坡上设置有钢丝网,便于对山石进行固定,降低了山石的滚落率,且铺设有植物秸秆网,通过将种植泥浆喷涂在植物秸秆网上,避免了种植泥浆的滑落,同时利用植物秸秆的自然腐烂为种植植物提供了一定的养分,从而提高了植物的存活率,进而降低了治理所需的费用。
Mine geological environment treatment method
一种矿山地质环境治理方法
LIN JIANQIU (Autor:in) / LIU NING (Autor:in) / WANG HAIMING (Autor:in) / LIN ZHENGQIN (Autor:in) / YE FEIYANG (Autor:in) / YAO WEI (Autor:in) / PENG JINGLIN (Autor:in) / LUO XIANGUI (Autor:in)
04.08.2023
Patent
Elektronische Ressource
Chinesisch
Mine geological environment recovery treatment method
Europäisches Patentamt | 2020
|Mine geological environment treatment engineering construction method
Europäisches Patentamt | 2021
|Waste mine geological environment restoration and treatment method
Europäisches Patentamt | 2022
|Retaining wall structure for mine engineering geological environment restoration and treatment
Europäisches Patentamt | 2022
|