Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete modular integrated building frame and implementation method thereof
The invention relates to a concrete modular integrated building framework and an implementation method thereof, the building framework comprises multiple layers of repeated sub-frameworks which are sequentially stacked from bottom to top, and each layer of sub-framework comprises at least two closely arranged main structure modules and at least one corridor module which is sequentially connected end to end; the top end and the bottom end of the main structure column are each provided with a steel bar outlet part of an embedded steel bar, the top end and the bottom end of the corridor column are each provided with a steel bar outlet part of an embedded steel bar, and external threads are formed in the steel bar outlet parts. The rib outlet part at the bottom end of the upper-layer main structure column is connected with the rib outlet part at the top end of the corresponding lower-layer main structure column through a double-straight-thread sleeve, and the rib outlet part at the bottom end of the upper-layer corridor column is connected with the rib outlet part at the top end of the corresponding lower-layer corridor column through a double-straight-thread sleeve. And safety, reliability and rapid construction can be realized.
本发明涉及一种混凝土模块化集成建筑框架及其实施方法,其中建筑框架包括由下至上依次堆叠的多层重复子框架,每层子框架均包括至少2个紧密排列的主结构模块和至少1个依次头尾相连的走廊模块;主结构柱的顶端端部和底端端部均具有预埋钢筋的出筋部,走廊柱的顶端端部和底端端部均具有预埋钢筋的出筋部,出筋部上开设有外螺纹,相邻层子框架之间,上层主结构柱底端的出筋部与其对应的下层主结构柱顶端的出筋部通过双直螺纹套筒连接,上层走廊柱底端的出筋部与其对应的下层走廊柱顶端的出筋部通过双直螺纹套筒连接。安全可靠,可快速施工。
Concrete modular integrated building frame and implementation method thereof
The invention relates to a concrete modular integrated building framework and an implementation method thereof, the building framework comprises multiple layers of repeated sub-frameworks which are sequentially stacked from bottom to top, and each layer of sub-framework comprises at least two closely arranged main structure modules and at least one corridor module which is sequentially connected end to end; the top end and the bottom end of the main structure column are each provided with a steel bar outlet part of an embedded steel bar, the top end and the bottom end of the corridor column are each provided with a steel bar outlet part of an embedded steel bar, and external threads are formed in the steel bar outlet parts. The rib outlet part at the bottom end of the upper-layer main structure column is connected with the rib outlet part at the top end of the corresponding lower-layer main structure column through a double-straight-thread sleeve, and the rib outlet part at the bottom end of the upper-layer corridor column is connected with the rib outlet part at the top end of the corresponding lower-layer corridor column through a double-straight-thread sleeve. And safety, reliability and rapid construction can be realized.
本发明涉及一种混凝土模块化集成建筑框架及其实施方法,其中建筑框架包括由下至上依次堆叠的多层重复子框架,每层子框架均包括至少2个紧密排列的主结构模块和至少1个依次头尾相连的走廊模块;主结构柱的顶端端部和底端端部均具有预埋钢筋的出筋部,走廊柱的顶端端部和底端端部均具有预埋钢筋的出筋部,出筋部上开设有外螺纹,相邻层子框架之间,上层主结构柱底端的出筋部与其对应的下层主结构柱顶端的出筋部通过双直螺纹套筒连接,上层走廊柱底端的出筋部与其对应的下层走廊柱顶端的出筋部通过双直螺纹套筒连接。安全可靠,可快速施工。
Concrete modular integrated building frame and implementation method thereof
一种混凝土模块化集成建筑框架及其实施方法
ZHANG JIAYI (Autor:in) / YAN CHEN (Autor:in) / CHEN CHAOJUN (Autor:in) / WANG QIONG (Autor:in) / DING TAO (Autor:in) / CHEN JING (Autor:in) / LAN ZELING (Autor:in) / ZHANG YIN (Autor:in)
04.08.2023
Patent
Elektronische Ressource
Chinesisch
Concrete modular integrated building frame and implementation method thereof
Europäisches Patentamt | 2024
|