Formwork frame and construction method thereof
The invention relates to the field of buildings, and particularly provides a formwork frame and a construction method thereof. A formwork frame comprises an outer side formwork set, a hanging formwork set, a column formwork set, an edge sealing formwork, a first steel bar set and a second steel bar set. The outer side formwork extends in the first direction. And the hoisting module and the outer side template are oppositely arranged to form a reverse ridge space, and the reverse ridge space is used for forming a reverse ridge. The column formwork set extends in the second direction, the column formwork set is located at one end of the outer side formwork and one end of the hanging formwork, and a wall column space is formed by the column formwork set. The edge sealing formwork is located at the end, close to the column formwork set, of the outer side formwork set and the end, close to the column formwork set, of the hanging formwork set and connected with the outer side formwork set and the hanging formwork set. The first steel bar set is located in the reverse ridge space and extends in the first direction, and one end of the first steel bar set penetrates through the edge sealing formwork. The second steel bar set is located in the wall column space and extends in the second direction, and the second steel bar set is connected with the end, penetrating through the edge sealing formwork, of the first steel bar set. The edge sealing formwork can prevent concrete in the reverse ridge space from flowing to the wall column space.
本申请涉及建筑领域,具体提供了一种模板框架及其施工方法。一种模板框架,包括外侧模板组、吊模组、柱模板组、封边模板、第一钢筋组及第二钢筋组。外侧模板沿第一方向延伸。吊模组与外侧模板相对设置,以形成反坎空间,反坎空间用于形成反坎。柱模板组沿第二方向延伸,柱模板组位于外侧模板及吊模组的一端,柱模板组形成有墙柱空间。封边模板位于外侧模板组及吊模组靠近柱模板组的一端,并与外侧模板组及吊模组连接。第一钢筋组位于反坎空间,并沿第一方向延伸,第一钢筋组的一端穿过封边模板。第二钢筋组位于墙柱空间,并沿第二方向延伸,第二钢筋组与第一钢筋组穿过封边模板的一端连接。封边模板能够阻反坎空间内的混凝土流向墙柱空间。
Formwork frame and construction method thereof
The invention relates to the field of buildings, and particularly provides a formwork frame and a construction method thereof. A formwork frame comprises an outer side formwork set, a hanging formwork set, a column formwork set, an edge sealing formwork, a first steel bar set and a second steel bar set. The outer side formwork extends in the first direction. And the hoisting module and the outer side template are oppositely arranged to form a reverse ridge space, and the reverse ridge space is used for forming a reverse ridge. The column formwork set extends in the second direction, the column formwork set is located at one end of the outer side formwork and one end of the hanging formwork, and a wall column space is formed by the column formwork set. The edge sealing formwork is located at the end, close to the column formwork set, of the outer side formwork set and the end, close to the column formwork set, of the hanging formwork set and connected with the outer side formwork set and the hanging formwork set. The first steel bar set is located in the reverse ridge space and extends in the first direction, and one end of the first steel bar set penetrates through the edge sealing formwork. The second steel bar set is located in the wall column space and extends in the second direction, and the second steel bar set is connected with the end, penetrating through the edge sealing formwork, of the first steel bar set. The edge sealing formwork can prevent concrete in the reverse ridge space from flowing to the wall column space.
本申请涉及建筑领域,具体提供了一种模板框架及其施工方法。一种模板框架,包括外侧模板组、吊模组、柱模板组、封边模板、第一钢筋组及第二钢筋组。外侧模板沿第一方向延伸。吊模组与外侧模板相对设置,以形成反坎空间,反坎空间用于形成反坎。柱模板组沿第二方向延伸,柱模板组位于外侧模板及吊模组的一端,柱模板组形成有墙柱空间。封边模板位于外侧模板组及吊模组靠近柱模板组的一端,并与外侧模板组及吊模组连接。第一钢筋组位于反坎空间,并沿第一方向延伸,第一钢筋组的一端穿过封边模板。第二钢筋组位于墙柱空间,并沿第二方向延伸,第二钢筋组与第一钢筋组穿过封边模板的一端连接。封边模板能够阻反坎空间内的混凝土流向墙柱空间。
Formwork frame and construction method thereof
模板框架及其施工方法
YUAN WANGXIAN (Autor:in) / YOU HU (Autor:in) / HE LIANG (Autor:in)
04.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Haunching formwork, formwork frame and construction method of formwork frame
Europäisches Patentamt | 2023
|Frame formwork integrated structure and construction method thereof
Europäisches Patentamt | 2024
|Movable formwork supporting frame assembly and construction method thereof
Europäisches Patentamt | 2024
|Steel frame GMT combined formwork and construction method thereof
Europäisches Patentamt | 2022
|Sloping roof formwork supporting frame and construction method thereof
Europäisches Patentamt | 2024
|