Fabricated construction platform and construction method
The invention discloses an assembly type construction platform and a construction method. The assembly type construction platform comprises a plurality of section molds. A plurality of swage dies are arranged; a pouring cavity mold and a plurality of section molds are formed in sequence from top to bottom in an overlapping mode; the components are connected through a connecting mechanism; each section mold; comprising a first template arranged oppositely; and a second template, wherein the first template is arranged; and a second template; a pouring cavity is formed; the first template is arranged on the base; and a second template; a sealing butt-joint mechanism is arranged at the butt-joint position of the first template and the second template; and a second template; the cavity mold and the cavity mold are locked through a locking mechanism; a support reinforcing mechanism is arranged between the base and the ground; the section molds can be sequentially stacked and assembled from top to bottom according to the construction requirement side, so that different working requirements and heights are formed, and therefore assembling is conducted according to the pouring progress.
本发明公开了一种装配式施工平台及施工方法,包括若干个型模;且若干个型模;从上到下依次叠加形成浇筑腔模,若干个型模;之间经连接机构连接;每个型模;包括对开设置的第一模板;和第二模板,所述第一模板;和第二模板;形成浇筑腔;且所述第一模板;和第二模板;的对接处设有密封对接机构,且所述第一模板;和第二模板;之间经锁定机构进行锁定,浇筑腔模;与地面之间设有支撑加强机构;本发明可以根据施工需求一侧对型模从上到下依次叠加装配,来形成不同工作需求使得高度,从而根据浇筑进度来进行装配。
Fabricated construction platform and construction method
The invention discloses an assembly type construction platform and a construction method. The assembly type construction platform comprises a plurality of section molds. A plurality of swage dies are arranged; a pouring cavity mold and a plurality of section molds are formed in sequence from top to bottom in an overlapping mode; the components are connected through a connecting mechanism; each section mold; comprising a first template arranged oppositely; and a second template, wherein the first template is arranged; and a second template; a pouring cavity is formed; the first template is arranged on the base; and a second template; a sealing butt-joint mechanism is arranged at the butt-joint position of the first template and the second template; and a second template; the cavity mold and the cavity mold are locked through a locking mechanism; a support reinforcing mechanism is arranged between the base and the ground; the section molds can be sequentially stacked and assembled from top to bottom according to the construction requirement side, so that different working requirements and heights are formed, and therefore assembling is conducted according to the pouring progress.
本发明公开了一种装配式施工平台及施工方法,包括若干个型模;且若干个型模;从上到下依次叠加形成浇筑腔模,若干个型模;之间经连接机构连接;每个型模;包括对开设置的第一模板;和第二模板,所述第一模板;和第二模板;形成浇筑腔;且所述第一模板;和第二模板;的对接处设有密封对接机构,且所述第一模板;和第二模板;之间经锁定机构进行锁定,浇筑腔模;与地面之间设有支撑加强机构;本发明可以根据施工需求一侧对型模从上到下依次叠加装配,来形成不同工作需求使得高度,从而根据浇筑进度来进行装配。
Fabricated construction platform and construction method
一种装配式施工平台及施工方法
LIU QIANQIAN (Autor:in) / LI JIANGUO (Autor:in) / ZHANG MENG (Autor:in) / YU TAO (Autor:in) / LIU YING (Autor:in)
08.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Fabricated construction platform and construction method thereof
Europäisches Patentamt | 2024
|