Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Crescent hanging basket suspension support system and construction method thereof
The construction method of the crescent hanging basket suspension support system comprises the steps that firstly, two sets of first buried rods are connected with a first anchoring plate, two sets of second buried rods are connected with a second anchoring plate, and front supporting legs are assembled; prestressed steel inhaul cables are tied to the cantilever beam units, and prestress is applied to the prestressed steel inhaul cables; and then the two cantilever beam units are temporarily connected through a first tie bolt and a second tie bolt. And 2, constructing a pitched roof structure, wherein when a roof panel is constructed, a front support and a rear support are installed on the roof panel. And thirdly, a front supporting leg and a rear supporting leg are installed on the front support and the rear support correspondingly. And 4, cantilever beam units are installed, wherein the two cantilever beam units are connected with the front supporting leg and the rear supporting leg correspondingly. The technical problems that a traditional support is relatively tedious to mount and dismount and needs to be matched with machinery, the influence is large during operation of other procedures after mounting, the safety risk is large due to the fact that the support cannot be well connected with a structure, and the problem of tilting of a pitched roof cannot be well solved are solved.
一种月牙形的吊篮悬挂支架系统及其施工方法,包括步骤一,将两组第一埋杆与第一锚固板连接,将两组第二埋杆与第二锚固板连接,组装前支腿;在悬臂梁单元上拉结预应力钢拉索,并且对预应力钢拉索施加预应力;然后将两根悬臂梁单元采用第一拉结螺栓和第二拉结螺栓进行临时连接。步骤二,施工坡屋面结构:施工屋面板时,在屋面板上安装前支座和后支座。步骤三,分别在前支座和后支座上安装前支腿与后支腿。步骤四,安装悬臂梁单元:将两根悬臂梁单元分别与前支腿和后支腿连接。本发明解决了传统的支架安装拆除相对繁琐需要配合机械、安装后其它工序作业时影响较大、与结构不能很好连接造成安全风险大以及针对坡屋面倾覆问题不能很好解决的技术问题。
Crescent hanging basket suspension support system and construction method thereof
The construction method of the crescent hanging basket suspension support system comprises the steps that firstly, two sets of first buried rods are connected with a first anchoring plate, two sets of second buried rods are connected with a second anchoring plate, and front supporting legs are assembled; prestressed steel inhaul cables are tied to the cantilever beam units, and prestress is applied to the prestressed steel inhaul cables; and then the two cantilever beam units are temporarily connected through a first tie bolt and a second tie bolt. And 2, constructing a pitched roof structure, wherein when a roof panel is constructed, a front support and a rear support are installed on the roof panel. And thirdly, a front supporting leg and a rear supporting leg are installed on the front support and the rear support correspondingly. And 4, cantilever beam units are installed, wherein the two cantilever beam units are connected with the front supporting leg and the rear supporting leg correspondingly. The technical problems that a traditional support is relatively tedious to mount and dismount and needs to be matched with machinery, the influence is large during operation of other procedures after mounting, the safety risk is large due to the fact that the support cannot be well connected with a structure, and the problem of tilting of a pitched roof cannot be well solved are solved.
一种月牙形的吊篮悬挂支架系统及其施工方法,包括步骤一,将两组第一埋杆与第一锚固板连接,将两组第二埋杆与第二锚固板连接,组装前支腿;在悬臂梁单元上拉结预应力钢拉索,并且对预应力钢拉索施加预应力;然后将两根悬臂梁单元采用第一拉结螺栓和第二拉结螺栓进行临时连接。步骤二,施工坡屋面结构:施工屋面板时,在屋面板上安装前支座和后支座。步骤三,分别在前支座和后支座上安装前支腿与后支腿。步骤四,安装悬臂梁单元:将两根悬臂梁单元分别与前支腿和后支腿连接。本发明解决了传统的支架安装拆除相对繁琐需要配合机械、安装后其它工序作业时影响较大、与结构不能很好连接造成安全风险大以及针对坡屋面倾覆问题不能很好解决的技术问题。
Crescent hanging basket suspension support system and construction method thereof
一种月牙形的吊篮悬挂支架系统及其施工方法
GUO FAN (Autor:in) / XIA GUANG (Autor:in) / LI JUN (Autor:in) / ZHAO XINGTAO (Autor:in) / WANG XIN (Autor:in)
08.08.2023
Patent
Elektronische Ressource
Chinesisch
Hanging basket suspension mechanism fixing device and hanging basket suspension system
Europäisches Patentamt | 2021
|Bridge hanging basket suspension casting construction method
Europäisches Patentamt | 2024
|Hanging basket suspension mechanism and mounting method of hanging basket suspension mechanism
Europäisches Patentamt | 2023
|Building hanging basket support and construction method thereof
Europäisches Patentamt | 2024
|