Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water conservancy project pump station and construction method thereof
The invention discloses a water conservancy project pump station and a construction method thereof, and belongs to the technical field of water conservancy projects. The water conservancy project pump station comprises a bottom plate, a wall body supported on the bottom plate and a top plate covering the top of the wall body. The wall comprises a first unit and a second unit which are connected in an assembled mode, and a water inlet is formed in the middle of the second unit. The second unit comprises a first edge part, a second edge part and a middle part connected between the first edge part and the second edge part; the water inlet is positioned among the first edge part, the second edge part and the middle part; a pouring cavity is formed in the middle part, and inserting ribs are reserved on the end surfaces of the edge part I and the edge part II and can be inserted into the pouring cavity; and the pouring cavity is filled with a concrete pouring block. The problem that in the prior art, the position of a rewater inlet of an assembly type wall is prone to damage is solved.
本申请公开了一种水利工程泵站及其施工方法,属于水利工程技术领域。水利工程泵站,包括底板、支承于底板上的墙体和覆盖于墙体顶部的顶板;墙体包括装配式连接的第一单元和第二单元,第二单元中部开设有进水口;第二单元边部一、边部二以及连接于边部一和边部二之间的中部,进水口位于边部一、边部二和中部之间;中部内部开设有浇筑空腔,且边部一和边部二的端面预留有插接筋,插接筋能够插入到浇筑空腔内部;且浇筑空腔内填充有混凝土浇筑块通过本申请,解决了现有技术中装配式墙体再进水口位置容易损伤的问题。
Water conservancy project pump station and construction method thereof
The invention discloses a water conservancy project pump station and a construction method thereof, and belongs to the technical field of water conservancy projects. The water conservancy project pump station comprises a bottom plate, a wall body supported on the bottom plate and a top plate covering the top of the wall body. The wall comprises a first unit and a second unit which are connected in an assembled mode, and a water inlet is formed in the middle of the second unit. The second unit comprises a first edge part, a second edge part and a middle part connected between the first edge part and the second edge part; the water inlet is positioned among the first edge part, the second edge part and the middle part; a pouring cavity is formed in the middle part, and inserting ribs are reserved on the end surfaces of the edge part I and the edge part II and can be inserted into the pouring cavity; and the pouring cavity is filled with a concrete pouring block. The problem that in the prior art, the position of a rewater inlet of an assembly type wall is prone to damage is solved.
本申请公开了一种水利工程泵站及其施工方法,属于水利工程技术领域。水利工程泵站,包括底板、支承于底板上的墙体和覆盖于墙体顶部的顶板;墙体包括装配式连接的第一单元和第二单元,第二单元中部开设有进水口;第二单元边部一、边部二以及连接于边部一和边部二之间的中部,进水口位于边部一、边部二和中部之间;中部内部开设有浇筑空腔,且边部一和边部二的端面预留有插接筋,插接筋能够插入到浇筑空腔内部;且浇筑空腔内填充有混凝土浇筑块通过本申请,解决了现有技术中装配式墙体再进水口位置容易损伤的问题。
Water conservancy project pump station and construction method thereof
水利工程泵站及其施工方法
JIN ZHENGPING (Autor:in) / PAN GUANGQIANG (Autor:in) / ZHENG YUNLONG (Autor:in) / ZHAO MINFEI (Autor:in) / ZHU HAN (Autor:in)
15.08.2023
Patent
Elektronische Ressource
Chinesisch
Flood drainage pump station for water conservancy project
Europäisches Patentamt | 2023
|Supporting structure for water conservancy pump station construction
Europäisches Patentamt | 2024
|Integrated buried prefabricated pump station for water conservancy project
Europäisches Patentamt | 2023
|Integrated pump station desilting equipment for water conservancy project
Europäisches Patentamt | 2024
|