Steel bar connecting structure of fabricated prefabricated parts and construction method of steel bar connecting structure
The steel bar connecting structure comprises a supporting column and a supporting plate, butt joint grooves are formed in the top end and the bottom end of the supporting column, first transverse rods are inserted into the butt joint grooves, second transverse rods are inserted into the butt joint grooves, and the outer sides of the two ends of the first transverse rods and the outer sides of the two ends of the second transverse rods are fixedly sleeved with fixing plates; baffles are installed on the front faces and the back faces of the first transverse rod and the second transverse rod. Through the concrete construction steps, after the concrete construction is completed, the concrete construction can also be completed by inserting the reinforcing steel bars into the corresponding positions after the structures are combined, correspondingly tying the reinforcing steel bars, hoisting and combining the combined whole body and then pouring the concrete. The construction convenience can be sacrificed, then the overall structural strength is improved, the concrete construction operation is suitable for semi-permanent building construction, structural force is stabilized conveniently, and the stress strength and stability are improved.
本发明公开了一种装配式预制构件的钢筋连接结构及其施工方法,包括支柱和支板,支柱的顶端和底端均开设有对接槽,对接槽的内部插接有横杆一,对接槽的内部插接有横杆二,横杆一和横杆二两端的外侧均固定套接有固定板,横杆一和横杆二的正面和背面均安装有挡板。通过设置的混凝土施工步骤,在混凝土施工完毕后,该混凝土施工也可以在将结构组合后,将钢筋插入对应位置后,并将钢筋进行对应扎钢筋作业,将组合完毕后的整体吊装组合后,进行灌入混凝土即可,可以牺牲施工的便利性进而增加整体的结构强度,混凝土的施工作业适应于半永久的建筑施工,便于稳定结构力,增加了受力强度和稳定性。
Steel bar connecting structure of fabricated prefabricated parts and construction method of steel bar connecting structure
The steel bar connecting structure comprises a supporting column and a supporting plate, butt joint grooves are formed in the top end and the bottom end of the supporting column, first transverse rods are inserted into the butt joint grooves, second transverse rods are inserted into the butt joint grooves, and the outer sides of the two ends of the first transverse rods and the outer sides of the two ends of the second transverse rods are fixedly sleeved with fixing plates; baffles are installed on the front faces and the back faces of the first transverse rod and the second transverse rod. Through the concrete construction steps, after the concrete construction is completed, the concrete construction can also be completed by inserting the reinforcing steel bars into the corresponding positions after the structures are combined, correspondingly tying the reinforcing steel bars, hoisting and combining the combined whole body and then pouring the concrete. The construction convenience can be sacrificed, then the overall structural strength is improved, the concrete construction operation is suitable for semi-permanent building construction, structural force is stabilized conveniently, and the stress strength and stability are improved.
本发明公开了一种装配式预制构件的钢筋连接结构及其施工方法,包括支柱和支板,支柱的顶端和底端均开设有对接槽,对接槽的内部插接有横杆一,对接槽的内部插接有横杆二,横杆一和横杆二两端的外侧均固定套接有固定板,横杆一和横杆二的正面和背面均安装有挡板。通过设置的混凝土施工步骤,在混凝土施工完毕后,该混凝土施工也可以在将结构组合后,将钢筋插入对应位置后,并将钢筋进行对应扎钢筋作业,将组合完毕后的整体吊装组合后,进行灌入混凝土即可,可以牺牲施工的便利性进而增加整体的结构强度,混凝土的施工作业适应于半永久的建筑施工,便于稳定结构力,增加了受力强度和稳定性。
Steel bar connecting structure of fabricated prefabricated parts and construction method of steel bar connecting structure
一种装配式预制构件的钢筋连接结构及其施工方法
JIANG LIN (Autor:in) / WU JIAN (Autor:in) / ZENG KE (Autor:in) / FENG HAITAO (Autor:in) / OUYANG JUNFU (Autor:in) / ZHAO ZHIHONG (Autor:in) / LIU ZHIPENG (Autor:in) / WU XIANG (Autor:in) / YANG ZHONGXING (Autor:in) / HUANG JIAN (Autor:in)
18.08.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Steel bar connecting structure for prefabricated parts
Europäisches Patentamt | 2021
|Connecting structure of prefabricated parts and connecting method of prefabricated parts
Europäisches Patentamt | 2024
|Connecting structure of prefabricated parts and connecting method of prefabricated parts
Europäisches Patentamt | 2024
|Fabricated connecting structure with prefabricated column and steel beam
Europäisches Patentamt | 2022
|