Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ring beam formwork erecting structure and erecting method
The invention relates to the field of ring beam formworks, in particular to a ring beam formwork erecting structure and method. Comprising a bearing cross beam, a fixing piece and two vertical abutting rods. The bearing cross beam is arranged at the top of the ring beam template; the two vertical abutting rods are slidably connected to the two ends of the bearing cross beam correspondingly, and the two vertical abutting rods form a reinforcing space for the ring beam formwork. The fixing piece is arranged on the vertical abutting rod and used for fixing the vertical abutting rod and the bearing cross beam. The two vertical abutting rods are moved, the two vertical abutting rods get close to each other, the two vertical abutting rods abut against the side face of the formwork, the fixing pieces are adjusted, the vertical abutting rods and the bearing cross beam are fixed through the fixing pieces, and when the formwork is dismounted, the fixing pieces and the vertical abutting rods are adjusted to be separated from the bearing cross beam, so that the formwork is dismounted. And the procedure of repairing screw holes formed by the opposite-pull screws after ring beam construction is completed in the related technology is omitted, and the ring beam machining efficiency is improved.
本申请涉及圈梁模板的领域,尤其是涉及一种圈梁模板支设结构及支设方法;包括承接横梁、固定件以及两个竖直抵紧杆;承接横梁设于圈梁模板的顶部;两个竖直抵紧杆分别滑动连接于承接横梁的两端,且两个竖直抵紧杆形成对圈梁模板的加固空间;固定件设于竖直抵紧杆上,用于将竖直抵紧杆与承接横梁固定;通过移动两个竖直抵紧杆,两个竖直抵紧杆相互靠近,两个竖直抵紧杆与模板的侧面抵紧,调节固定件,固定件将竖直抵紧杆与承接横梁进行固定,当拆除模板时,调节固定件,竖直抵紧杆与承接横梁分离,减少相关技术中需要在圈梁施工完成后对对拉螺杆形成的螺眼进行修复的工序,提高了对圈梁加工的效率。
Ring beam formwork erecting structure and erecting method
The invention relates to the field of ring beam formworks, in particular to a ring beam formwork erecting structure and method. Comprising a bearing cross beam, a fixing piece and two vertical abutting rods. The bearing cross beam is arranged at the top of the ring beam template; the two vertical abutting rods are slidably connected to the two ends of the bearing cross beam correspondingly, and the two vertical abutting rods form a reinforcing space for the ring beam formwork. The fixing piece is arranged on the vertical abutting rod and used for fixing the vertical abutting rod and the bearing cross beam. The two vertical abutting rods are moved, the two vertical abutting rods get close to each other, the two vertical abutting rods abut against the side face of the formwork, the fixing pieces are adjusted, the vertical abutting rods and the bearing cross beam are fixed through the fixing pieces, and when the formwork is dismounted, the fixing pieces and the vertical abutting rods are adjusted to be separated from the bearing cross beam, so that the formwork is dismounted. And the procedure of repairing screw holes formed by the opposite-pull screws after ring beam construction is completed in the related technology is omitted, and the ring beam machining efficiency is improved.
本申请涉及圈梁模板的领域,尤其是涉及一种圈梁模板支设结构及支设方法;包括承接横梁、固定件以及两个竖直抵紧杆;承接横梁设于圈梁模板的顶部;两个竖直抵紧杆分别滑动连接于承接横梁的两端,且两个竖直抵紧杆形成对圈梁模板的加固空间;固定件设于竖直抵紧杆上,用于将竖直抵紧杆与承接横梁固定;通过移动两个竖直抵紧杆,两个竖直抵紧杆相互靠近,两个竖直抵紧杆与模板的侧面抵紧,调节固定件,固定件将竖直抵紧杆与承接横梁进行固定,当拆除模板时,调节固定件,竖直抵紧杆与承接横梁分离,减少相关技术中需要在圈梁施工完成后对对拉螺杆形成的螺眼进行修复的工序,提高了对圈梁加工的效率。
Ring beam formwork erecting structure and erecting method
一种圈梁模板支设结构及支设方法
LI SHENG (Autor:in) / WANG LONG (Autor:in) / FENG YANGYANG (Autor:in) / CHENG TING (Autor:in)
18.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building formwork erecting system and formwork erecting method
Europäisches Patentamt | 2023
|Building cornice integrated formwork erecting structure and formwork erecting method
Europäisches Patentamt | 2023
|Wall single-side formwork erecting device and formwork erecting method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|