Frame beam dismantling construction method
The invention discloses a frame beam dismantling construction method. The frame beam dismantling construction method comprises the following steps that firstly, a lowering system is erected; a lowering system is erected above the frame beam, a supporting point of the lowering system is arranged at the top of a pier, and the lowering system is used for transporting or lowering a to-be-dismantled frame beam section; 2, traffic conversion and protection shed installation; a protective shed is installed at the position of one half frame beam, the other half frame beam is closed to serve as a construction channel, and road traffic is converted into the protective shed; 3, dismantling the frame beam in a span mode; the frame beams are cut span by span and section by section according to a set sequence, and the frame beams are dismantled span by span and section by section according to the sequence by adopting a lowering system; fourthly, the lowering system is dismantled; and fifthly, the bridge piers are dismantled, and dismantling work of the frame beam is completed. The frame beam demolition construction method can better adapt to a bridge structure and a construction environment, and rapid demolition construction is achieved.
本发明公开了一种框架梁拆除施工方法,包括如下步骤:步骤一:下放系统搭设;在框架梁上方搭设下放系统,其支撑点设置于桥墩顶部,所述下放系统用于运输或下放待拆除的框架梁段;步骤二:交通转换、防护棚安装;在其中半幅框架梁的位置安装防护棚,另外半幅框架梁封闭作为施工通道,将道路交通转换至防护棚内;步骤三:框架梁分跨拆除;按设定的顺序逐跨逐段切割框架梁,并采用下放系统按顺序逐跨逐段拆除框架梁;步骤四:拆除下放系统;步骤五:拆除桥墩,完成框架梁的拆除工作。本发明的框架梁拆除施工方法能够更好的适应桥梁结构和施工环境,实现快速拆除施工。
Frame beam dismantling construction method
The invention discloses a frame beam dismantling construction method. The frame beam dismantling construction method comprises the following steps that firstly, a lowering system is erected; a lowering system is erected above the frame beam, a supporting point of the lowering system is arranged at the top of a pier, and the lowering system is used for transporting or lowering a to-be-dismantled frame beam section; 2, traffic conversion and protection shed installation; a protective shed is installed at the position of one half frame beam, the other half frame beam is closed to serve as a construction channel, and road traffic is converted into the protective shed; 3, dismantling the frame beam in a span mode; the frame beams are cut span by span and section by section according to a set sequence, and the frame beams are dismantled span by span and section by section according to the sequence by adopting a lowering system; fourthly, the lowering system is dismantled; and fifthly, the bridge piers are dismantled, and dismantling work of the frame beam is completed. The frame beam demolition construction method can better adapt to a bridge structure and a construction environment, and rapid demolition construction is achieved.
本发明公开了一种框架梁拆除施工方法,包括如下步骤:步骤一:下放系统搭设;在框架梁上方搭设下放系统,其支撑点设置于桥墩顶部,所述下放系统用于运输或下放待拆除的框架梁段;步骤二:交通转换、防护棚安装;在其中半幅框架梁的位置安装防护棚,另外半幅框架梁封闭作为施工通道,将道路交通转换至防护棚内;步骤三:框架梁分跨拆除;按设定的顺序逐跨逐段切割框架梁,并采用下放系统按顺序逐跨逐段拆除框架梁;步骤四:拆除下放系统;步骤五:拆除桥墩,完成框架梁的拆除工作。本发明的框架梁拆除施工方法能够更好的适应桥梁结构和施工环境,实现快速拆除施工。
Frame beam dismantling construction method
一种框架梁拆除施工方法
ZHANG HONG (Autor:in) / MA LIN (Autor:in) / LIU JIANGUO (Autor:in) / YUAN CHAO (Autor:in) / NIE HAO (Autor:in) / HUANG TAO (Autor:in) / HUANG JIANFENG (Autor:in) / ZENG SIQING (Autor:in) / YUE WU (Autor:in) / WANG WEILI (Autor:in)
22.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Static dismantling construction method for independent frame beam suspended at high position
Europäisches Patentamt | 2021
|Dome assembling jig frame scattered dismantling construction method
Europäisches Patentamt | 2024
|Building frame dismantling device and dismantling method thereof
Europäisches Patentamt | 2024
|Main bridge continuous beam dismantling construction method
Europäisches Patentamt | 2024
|