Rainwater and sewage diversion-based construction device in culvert and use method of rainwater and sewage diversion-based construction device in culvert
The invention discloses a construction device in a culvert based on rainwater and sewage diversion and a use method. The construction device comprises a first retaining wall plate (1) arranged on one opening of the culvert, a second retaining wall plate (2) arranged on the other opening of the culvert, and a pipe gallery frame (3) arranged between the first retaining wall plate (1) and the second retaining wall plate (2). Through the first retaining wall plate (1) and the second retaining wall plate (2), a plugging construction platform is installed on a culvert opening, through the pipe gallery frame (3), a middle drainage supporting beam frame is installed in the culvert opening, and a construction track body extends in the culvert opening. The technical problems that the water inlet of the culvert is blocked and constructors stand on the ground of the culvert to conduct construction operation are solved, and therefore the culvert overhaul and maintenance construction efficiency in the culvert is improved.
一种基于雨水和污水分流的在涵洞中施工装置和使用方法,包含有设置在涵洞的其中一个洞口上的第一挡墙板(1)、设置在涵洞的其中另一个洞口上的第二挡墙板(2)、设置在第一挡墙板(1)和第二挡墙板(2)之间的管廊架(3),通过第一挡墙板(1)和第二挡墙板(2),实现了在涵洞的洞口上安装封堵施工平台,通过管廊架(3),实现了在洞口中安装中间排水支撑梁架,实现了在洞口中延伸有施工轨道体,解决了对都是把涵洞的进水洞口进行封堵和施工人员站立在涵洞地面上进行施工作业的技术问题,因此提高了在涵洞中进行对涵洞检修维护施工效率。
Rainwater and sewage diversion-based construction device in culvert and use method of rainwater and sewage diversion-based construction device in culvert
The invention discloses a construction device in a culvert based on rainwater and sewage diversion and a use method. The construction device comprises a first retaining wall plate (1) arranged on one opening of the culvert, a second retaining wall plate (2) arranged on the other opening of the culvert, and a pipe gallery frame (3) arranged between the first retaining wall plate (1) and the second retaining wall plate (2). Through the first retaining wall plate (1) and the second retaining wall plate (2), a plugging construction platform is installed on a culvert opening, through the pipe gallery frame (3), a middle drainage supporting beam frame is installed in the culvert opening, and a construction track body extends in the culvert opening. The technical problems that the water inlet of the culvert is blocked and constructors stand on the ground of the culvert to conduct construction operation are solved, and therefore the culvert overhaul and maintenance construction efficiency in the culvert is improved.
一种基于雨水和污水分流的在涵洞中施工装置和使用方法,包含有设置在涵洞的其中一个洞口上的第一挡墙板(1)、设置在涵洞的其中另一个洞口上的第二挡墙板(2)、设置在第一挡墙板(1)和第二挡墙板(2)之间的管廊架(3),通过第一挡墙板(1)和第二挡墙板(2),实现了在涵洞的洞口上安装封堵施工平台,通过管廊架(3),实现了在洞口中安装中间排水支撑梁架,实现了在洞口中延伸有施工轨道体,解决了对都是把涵洞的进水洞口进行封堵和施工人员站立在涵洞地面上进行施工作业的技术问题,因此提高了在涵洞中进行对涵洞检修维护施工效率。
Rainwater and sewage diversion-based construction device in culvert and use method of rainwater and sewage diversion-based construction device in culvert
基于雨水和污水分流的在涵洞中施工装置和使用方法
XIE QINGHE (Autor:in) / DING JIANZHOU (Autor:in) / YANG SHUAI (Autor:in) / QIN PENG (Autor:in) / SUN QIHE (Autor:in) / BI YANMEI (Autor:in) / TIAN JIN (Autor:in) / ZHOU SHUMEI (Autor:in) / LI WENPENG (Autor:in) / ZHANG XIANGFEI (Autor:in)
22.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Culvert inner wall coating construction device and method based on rainwater and sewage diversion