The invention discloses a safety early warning device for deep foundation pit excavation construction and a using method, and belongs to the technical field of foundation pit construction. The warning board comprises a plurality of guardrails, the guardrails are arranged at intervals, a warning board is fixedly installed on each group of guardrails, the warning board further comprises a plurality of connecting mechanisms, and the connecting mechanisms are movably installed between the adjacent guardrails and used for connecting the adjacent guardrails. Adjacent guardrails are placed at intervals, a movable plate ascends to enable a vertical rod to move upwards, a sleeve is moved to the position below the vertical rod, a first spring extends to enable the vertical rod to be inserted into the sleeve, and therefore the effect of connecting the adjacent guardrails is achieved; a second spring extends to enable a sliding block to move, so that a hinge rod moves to drive an inserting rod to be inserted into a vertical rod, and the effect of fixing the position of the vertical rod is achieved; the connected guardrails are placed on the periphery of the deep foundation pit, and the fixing nails are inserted into the ground for fixing, so that the effect of performing safety early warning on deep foundation pit construction is achieved.
本发明公开了一种用于深基坑开挖施工的安全预警装置及使用方法,属于基坑施工技术领域。本发明包括若干护栏,若干护栏间隔布置,每组护栏上均固定安装有警示牌,还包括若干连接机构,若干连接机构活动安装在相邻的护栏之间,若干连接机构均用于连接相邻的护栏。本发明通过将相邻的护栏间隔放置,将活动板上升使得竖杆上移,移动套筒至竖杆下方,通过第一弹簧伸长使得竖杆插入套筒中,从而达到对相邻的护栏进行连接的效果;通过第二弹簧伸长使得滑块移动,从而使得铰接杆活动,带动插杆插入竖杆中,达到固定竖杆位置的效果;通过将连接的护栏放置在深基坑的周围,通过固定钉插入地面进行固定,达到对深基坑施工进行安全预警的效果。
The invention discloses a safety early warning device for deep foundation pit excavation construction and a using method, and belongs to the technical field of foundation pit construction. The warning board comprises a plurality of guardrails, the guardrails are arranged at intervals, a warning board is fixedly installed on each group of guardrails, the warning board further comprises a plurality of connecting mechanisms, and the connecting mechanisms are movably installed between the adjacent guardrails and used for connecting the adjacent guardrails. Adjacent guardrails are placed at intervals, a movable plate ascends to enable a vertical rod to move upwards, a sleeve is moved to the position below the vertical rod, a first spring extends to enable the vertical rod to be inserted into the sleeve, and therefore the effect of connecting the adjacent guardrails is achieved; a second spring extends to enable a sliding block to move, so that a hinge rod moves to drive an inserting rod to be inserted into a vertical rod, and the effect of fixing the position of the vertical rod is achieved; the connected guardrails are placed on the periphery of the deep foundation pit, and the fixing nails are inserted into the ground for fixing, so that the effect of performing safety early warning on deep foundation pit construction is achieved.
本发明公开了一种用于深基坑开挖施工的安全预警装置及使用方法,属于基坑施工技术领域。本发明包括若干护栏,若干护栏间隔布置,每组护栏上均固定安装有警示牌,还包括若干连接机构,若干连接机构活动安装在相邻的护栏之间,若干连接机构均用于连接相邻的护栏。本发明通过将相邻的护栏间隔放置,将活动板上升使得竖杆上移,移动套筒至竖杆下方,通过第一弹簧伸长使得竖杆插入套筒中,从而达到对相邻的护栏进行连接的效果;通过第二弹簧伸长使得滑块移动,从而使得铰接杆活动,带动插杆插入竖杆中,达到固定竖杆位置的效果;通过将连接的护栏放置在深基坑的周围,通过固定钉插入地面进行固定,达到对深基坑施工进行安全预警的效果。
Safety early warning device for deep foundation pit excavation construction and using method
一种用于深基坑开挖施工的安全预警装置及使用方法
22.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
/
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2024
|Safety Monitoring and Early Warning for Deep Foundation Pit Construction
British Library Conference Proceedings | 2010
|