Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of building supporting swing column
The invention provides a construction method of a building supporting swing column, and belongs to the technical field of building structures.The construction method of the building supporting swing column comprises the following steps that S01, the swing column is manufactured, and the swing column comprises a straight pipe section, a taper pipe section, a lower support and an upper support; s02, pre-connection is conducted on a machining site, the lower support and the taper pipe section are installed together through a rotary damper, and the taper pipe section and the straight pipe section are spliced together; s03, hoisting the pre-connected swing column to a required position of a construction site, and fixing the swing column by using a temporary support; s04, the upper support and the roof beam are spliced and welded on the ground, and the upper support and the roof beam are hoisted in place to be connected and welded to the taper pipe section in the high altitude; s05, the swing column is corrected, and the temporary support is dismantled after correction is completed. According to the method, the problem that the swing column consumes sidesway energy to protect the building structure when the building is stressed can be effectively solved, and meanwhile the lateral stiffness can be guaranteed.
本发明提供了一种建筑支撑摇摆柱的施工方法,属于建筑结构技术领域,该建筑支撑摇摆柱的施工方法包括以下步骤:S01:制作摇摆柱,所述摇摆柱包括直管段、锥管段、下支座和上支座;S02:在加工场地进行预接,将所述下支座与所述锥管段通过旋转阻尼器安装在一起,将所述锥管段与所述直管段拼接在一起;S03:将预接的所述摇摆柱吊装到施工场地所需位置,使用临时支撑对所述摇摆柱进行固定;S04:将所述上支座与屋面梁在地面拼装、焊接好,吊装就位在高空与所述锥管段相连焊接;S05:对摇摆柱进行校正,校正完成后拆除所述临时支撑,本发明可以有效解决摇摆柱在建筑受力时消耗侧移能量保护建筑结构,同时还能够保证抗侧刚度的问题。
Construction method of building supporting swing column
The invention provides a construction method of a building supporting swing column, and belongs to the technical field of building structures.The construction method of the building supporting swing column comprises the following steps that S01, the swing column is manufactured, and the swing column comprises a straight pipe section, a taper pipe section, a lower support and an upper support; s02, pre-connection is conducted on a machining site, the lower support and the taper pipe section are installed together through a rotary damper, and the taper pipe section and the straight pipe section are spliced together; s03, hoisting the pre-connected swing column to a required position of a construction site, and fixing the swing column by using a temporary support; s04, the upper support and the roof beam are spliced and welded on the ground, and the upper support and the roof beam are hoisted in place to be connected and welded to the taper pipe section in the high altitude; s05, the swing column is corrected, and the temporary support is dismantled after correction is completed. According to the method, the problem that the swing column consumes sidesway energy to protect the building structure when the building is stressed can be effectively solved, and meanwhile the lateral stiffness can be guaranteed.
本发明提供了一种建筑支撑摇摆柱的施工方法,属于建筑结构技术领域,该建筑支撑摇摆柱的施工方法包括以下步骤:S01:制作摇摆柱,所述摇摆柱包括直管段、锥管段、下支座和上支座;S02:在加工场地进行预接,将所述下支座与所述锥管段通过旋转阻尼器安装在一起,将所述锥管段与所述直管段拼接在一起;S03:将预接的所述摇摆柱吊装到施工场地所需位置,使用临时支撑对所述摇摆柱进行固定;S04:将所述上支座与屋面梁在地面拼装、焊接好,吊装就位在高空与所述锥管段相连焊接;S05:对摇摆柱进行校正,校正完成后拆除所述临时支撑,本发明可以有效解决摇摆柱在建筑受力时消耗侧移能量保护建筑结构,同时还能够保证抗侧刚度的问题。
Construction method of building supporting swing column
XU GUANGMING / FU LIN / PAN AIMIN / GUO HONGXIN / SHI LINPENG / WU XIAO / HAN YUXUAN / WANG TINGZHENG / ZHANG NING / YU XINKUN
Patent
Elektronische Ressource
Novel ultrahigh swing column temporary supporting device
Europäisches Patentamt | 2023
|Building supporting column enclosure system and construction method thereof
Europäisches Patentamt | 2021
|Supporting column pouring formwork for building bridge construction
Europäisches Patentamt | 2021
|Swing column for supporting large-span steel structure roof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|