Laminated slab mounting method
The invention provides a laminated slab mounting method, and belongs to the technical field of building construction.The laminated slab mounting method specifically comprises the following steps that laminated slab components enter a site, and the laminated slab components are unloaded and then stacked in order; drawing a laminated slab elevation control line on the shear wall; mounting and laying a plate top template according to the elevation control line; the laminated slabs are hoisted to the slab top formworks at the corresponding positions, and formwork supports of the slab top formworks are made; the adjacent laminated slabs are leveled and checked; the reinforcing steel bars are used for connecting the adjacent composite floor slabs and the wall coupling beams; the binding beam steel bars and the laminated slab upper-layer two-way steel bars form a steel bar net; an electromechanical wire pipe is pre-buried, and a wire box and a hole are reserved; concrete is poured on the laminated slab, and then the concrete is cured; hoisting the prefabricated staircase at the laminated plate; after the construction of the laminated slab of this layer is completed, the construction of the laminated slab of the next layer is started, and the hollowing between the laminated slab and the slab top template can be found in time.
本发明提供了一种叠合板安装方法,属于建筑施工技术领域,该叠合板安装方法,具体包括以下步骤:叠合板构件进场,将叠合板构件卸车后有序堆放;在剪力墙上画出叠合板标高控制线;按照标高控制线进行板顶模板安装铺放;将叠合板吊装到对应位置的板顶模板上,并做好板顶模板的模板支撑;对相邻的叠合板进行调平校核;连接相邻的叠合楼板与墙体连梁的钢筋;绑扎梁钢筋与叠合板上层双向钢筋形成钢筋网;预埋机电线管、预留线盒及孔洞;叠合板上进行混凝土浇筑,然后对混凝土进行养护;吊装该层叠合板处的预制楼梯;本层叠合板施工完成,开始下一层叠合板施工,本发明能够及时发现叠合板和板顶模板之间的空鼓。
Laminated slab mounting method
The invention provides a laminated slab mounting method, and belongs to the technical field of building construction.The laminated slab mounting method specifically comprises the following steps that laminated slab components enter a site, and the laminated slab components are unloaded and then stacked in order; drawing a laminated slab elevation control line on the shear wall; mounting and laying a plate top template according to the elevation control line; the laminated slabs are hoisted to the slab top formworks at the corresponding positions, and formwork supports of the slab top formworks are made; the adjacent laminated slabs are leveled and checked; the reinforcing steel bars are used for connecting the adjacent composite floor slabs and the wall coupling beams; the binding beam steel bars and the laminated slab upper-layer two-way steel bars form a steel bar net; an electromechanical wire pipe is pre-buried, and a wire box and a hole are reserved; concrete is poured on the laminated slab, and then the concrete is cured; hoisting the prefabricated staircase at the laminated plate; after the construction of the laminated slab of this layer is completed, the construction of the laminated slab of the next layer is started, and the hollowing between the laminated slab and the slab top template can be found in time.
本发明提供了一种叠合板安装方法,属于建筑施工技术领域,该叠合板安装方法,具体包括以下步骤:叠合板构件进场,将叠合板构件卸车后有序堆放;在剪力墙上画出叠合板标高控制线;按照标高控制线进行板顶模板安装铺放;将叠合板吊装到对应位置的板顶模板上,并做好板顶模板的模板支撑;对相邻的叠合板进行调平校核;连接相邻的叠合楼板与墙体连梁的钢筋;绑扎梁钢筋与叠合板上层双向钢筋形成钢筋网;预埋机电线管、预留线盒及孔洞;叠合板上进行混凝土浇筑,然后对混凝土进行养护;吊装该层叠合板处的预制楼梯;本层叠合板施工完成,开始下一层叠合板施工,本发明能够及时发现叠合板和板顶模板之间的空鼓。
Laminated slab mounting method
一种叠合板安装方法
ZHANG BAOLONG (Autor:in) / WANG XIANGZHI (Autor:in) / ZHAO HE (Autor:in) / ZHANG ZHAOJIAN (Autor:in) / WANG XILONG (Autor:in) / LI CHENGYI (Autor:in)
29.08.2023
Patent
Elektronische Ressource
Chinesisch
Prefabricated laminated slab mounting construction method