Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Operation platform for wharf cast-in-place beam construction
The invention discloses a wharf cast-in-place cross beam construction operation platform which comprises an operation platform body and cross beam battens, the operation platform body is installed between the cross beam battens of two cross beams, a second installation frame and a first installation frame are arranged on the operation platform body, and steel grids are fixed to the upper end of the second installation frame and the upper end of the first installation frame. Hinges are uniformly mounted between the second mounting frame and the first mounting frame at intervals, so that the second mounting frame and the first mounting frame can rotate relative to each other, and second supporting steel pipes and first supporting steel pipes are uniformly fixed at the lower ends of the second mounting frame and the first mounting frame at intervals respectively; and the first supporting steel pipe corresponds to the second supporting steel pipe in position. The wharf cast-in-place cross beam construction operation platform is built between two cross beams, efficient protection treatment is conducted through the steel grids, the operation space is effectively increased, and construction operation of the wharf cast-in-place cross beams is more convenient.
本发明公开了一种码头现浇横梁施工操作平台,包括操作平台主体和横梁木方,所述操作平台主体安装于两榀横梁的横梁木方之间,所述操作平台主体上设有第二安装框和第一安装框,且第二安装框和第一安装框上端均固定有钢网格,并且第二安装框和第一安装框之间均匀间隔安装有合页,使第二安装框和第一安装框之间能够相互转动,所述第二安装框和第一安装框下端分别均匀间隔固定有第二支撑钢管以及第一支撑钢管,且第一支撑钢管和第二支撑钢管位置相对应。该码头现浇横梁施工操作平台搭建在两榀横梁之间,通过钢网格进行高效的防护处理,并有效增加操作空间,更便于码头现浇横梁的施工操作。
Operation platform for wharf cast-in-place beam construction
The invention discloses a wharf cast-in-place cross beam construction operation platform which comprises an operation platform body and cross beam battens, the operation platform body is installed between the cross beam battens of two cross beams, a second installation frame and a first installation frame are arranged on the operation platform body, and steel grids are fixed to the upper end of the second installation frame and the upper end of the first installation frame. Hinges are uniformly mounted between the second mounting frame and the first mounting frame at intervals, so that the second mounting frame and the first mounting frame can rotate relative to each other, and second supporting steel pipes and first supporting steel pipes are uniformly fixed at the lower ends of the second mounting frame and the first mounting frame at intervals respectively; and the first supporting steel pipe corresponds to the second supporting steel pipe in position. The wharf cast-in-place cross beam construction operation platform is built between two cross beams, efficient protection treatment is conducted through the steel grids, the operation space is effectively increased, and construction operation of the wharf cast-in-place cross beams is more convenient.
本发明公开了一种码头现浇横梁施工操作平台,包括操作平台主体和横梁木方,所述操作平台主体安装于两榀横梁的横梁木方之间,所述操作平台主体上设有第二安装框和第一安装框,且第二安装框和第一安装框上端均固定有钢网格,并且第二安装框和第一安装框之间均匀间隔安装有合页,使第二安装框和第一安装框之间能够相互转动,所述第二安装框和第一安装框下端分别均匀间隔固定有第二支撑钢管以及第一支撑钢管,且第一支撑钢管和第二支撑钢管位置相对应。该码头现浇横梁施工操作平台搭建在两榀横梁之间,通过钢网格进行高效的防护处理,并有效增加操作空间,更便于码头现浇横梁的施工操作。
Operation platform for wharf cast-in-place beam construction
一种码头现浇横梁施工操作平台
01.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Cross beam cast-in-place construction technology for long-piled wharf construction
Europäisches Patentamt | 2024
|Cast-in-place wharf surface layer construction process
Europäisches Patentamt | 2023
|METHOD FOR BUILDING PLATFORM FOR CONSTRUCTION OF CAST-IN-PLACE PILES OF HIGH-PILED WHARF
Europäisches Patentamt | 2023
|Construction process for cast-in-place breast wall of gravity type wharf
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|