Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated road plate on construction site and manufacturing method thereof
The invention provides a construction site prefabricated road plate which comprises a plate body, the left side of the plate body is provided with a drainage area in the length direction of the plate body, the drainage area comprises a groove body, the inner bottom of the groove body is provided with a plurality of pre-buried perforated collecting pipes, and the upper ends of the pre-buried perforated collecting pipes are provided with gravel filtering layers. A planting soil surface layer is arranged at the upper end of the gravel filtering layer, the pre-buried perforated collecting pipe is connected with a backwashing pipe, and the outer end of the backwashing pipe extends to the position above the tank body and is provided with a spraying opening. The temporary road level and the temporary drainage efficiency of the construction site can be remarkably improved.
本发明提供一种施工现场预制道路板,包括板本体,所述板本体的左侧沿其长度方向设有排水区,所述排水区包括槽体,所述槽体的内底部设有若干预埋穿孔收集管,所述预埋穿孔收集管的上端设有碎石过滤层,所述碎石过滤层的上端设有种植土面层,所述预埋穿孔收集管与反冲洗管相连接,所述反冲洗管的外端延伸至所述槽体的上方,并设置有喷洒口。本发明能够显著提升施工现场临时道路水平与临时排水效率。
Prefabricated road plate on construction site and manufacturing method thereof
The invention provides a construction site prefabricated road plate which comprises a plate body, the left side of the plate body is provided with a drainage area in the length direction of the plate body, the drainage area comprises a groove body, the inner bottom of the groove body is provided with a plurality of pre-buried perforated collecting pipes, and the upper ends of the pre-buried perforated collecting pipes are provided with gravel filtering layers. A planting soil surface layer is arranged at the upper end of the gravel filtering layer, the pre-buried perforated collecting pipe is connected with a backwashing pipe, and the outer end of the backwashing pipe extends to the position above the tank body and is provided with a spraying opening. The temporary road level and the temporary drainage efficiency of the construction site can be remarkably improved.
本发明提供一种施工现场预制道路板,包括板本体,所述板本体的左侧沿其长度方向设有排水区,所述排水区包括槽体,所述槽体的内底部设有若干预埋穿孔收集管,所述预埋穿孔收集管的上端设有碎石过滤层,所述碎石过滤层的上端设有种植土面层,所述预埋穿孔收集管与反冲洗管相连接,所述反冲洗管的外端延伸至所述槽体的上方,并设置有喷洒口。本发明能够显著提升施工现场临时道路水平与临时排水效率。
Prefabricated road plate on construction site and manufacturing method thereof
一种施工现场预制道路板及其制作方法
SHI SHUHANG (Autor:in) / CHEN GANG (Autor:in) / ZHANG SHENGKAI (Autor:in) / ZHANG SHAOFEI (Autor:in) / ZENG JINGWEI (Autor:in) / DING SUDONG (Autor:in) / ZHU WEIXIN (Autor:in) / XIE DONGZHOU (Autor:in)
05.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
B01D
SEPARATION
,
Trennen
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
Europäisches Patentamt | 2024
|Construction technology of reusable prefabricated road on construction site
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Prefabricated loading temporary road system on construction site
Europäisches Patentamt | 2022
|