一种斜拉桥超高主塔施工方法
本申请公开了一种斜拉桥超高主塔施工方法,通过浇筑形成塔柱起始段;然后在两个塔柱起始段外周分别组拼爬模结构,爬模结构在塔柱的顶部形成浇筑腔,在两个爬模结构的顶部架放桁架,通过在浇筑腔内进行浇筑,形成新的下塔柱段,然后起吊桁架,桁架带动两个爬模结构上移至塔柱下一段的施工位置,然后再进行浇筑施工,重复步骤直至下塔柱施工完成;然后在两个下塔柱之间搭建施工平台,并在两个下塔柱顶部完成下横梁浇筑施工;重复上述操作完成中塔柱爬模浇筑施工以及中横梁浇筑施工,最后完成上塔柱爬模浇筑施工,本申请具有减少施工过程中对塔身不良影响的效果。
A method of constructing a tower of a cable-stayed bridge comprises the steps of: pouring a starting segment of a tower pillar on a bridge pier 1; using outwardly inclined climbing formwork structures 7 to pour two lower tower pillars 2, where a truss 8 which may be connected to a crane 9 is arranged on the top of the two climbing formwork structures and is lifted and drives the two climbing formwork structures to move to the next construction portion of the tower pillars; a construction platform is built between the two lower tower pillars, and a lower beam is poured on the top of the two lower tower pillars; exchanging the climbing formworks on the truss and pouring inwardly inclined middle tower pillars followed by the pouring of an upper beam; and, the pouring for an upper tower pillar is completed. The climbing formworks may include first and second supporting platforms and driving components in the form of hydraulic cylinders to move side formworks.
一种斜拉桥超高主塔施工方法
本申请公开了一种斜拉桥超高主塔施工方法,通过浇筑形成塔柱起始段;然后在两个塔柱起始段外周分别组拼爬模结构,爬模结构在塔柱的顶部形成浇筑腔,在两个爬模结构的顶部架放桁架,通过在浇筑腔内进行浇筑,形成新的下塔柱段,然后起吊桁架,桁架带动两个爬模结构上移至塔柱下一段的施工位置,然后再进行浇筑施工,重复步骤直至下塔柱施工完成;然后在两个下塔柱之间搭建施工平台,并在两个下塔柱顶部完成下横梁浇筑施工;重复上述操作完成中塔柱爬模浇筑施工以及中横梁浇筑施工,最后完成上塔柱爬模浇筑施工,本申请具有减少施工过程中对塔身不良影响的效果。
A method of constructing a tower of a cable-stayed bridge comprises the steps of: pouring a starting segment of a tower pillar on a bridge pier 1; using outwardly inclined climbing formwork structures 7 to pour two lower tower pillars 2, where a truss 8 which may be connected to a crane 9 is arranged on the top of the two climbing formwork structures and is lifted and drives the two climbing formwork structures to move to the next construction portion of the tower pillars; a construction platform is built between the two lower tower pillars, and a lower beam is poured on the top of the two lower tower pillars; exchanging the climbing formworks on the truss and pouring inwardly inclined middle tower pillars followed by the pouring of an upper beam; and, the pouring for an upper tower pillar is completed. The climbing formworks may include first and second supporting platforms and driving components in the form of hydraulic cylinders to move side formworks.
一种斜拉桥超高主塔施工方法