Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hanging basket suspended casting structure and hanging basket suspended casting construction method
The invention relates to the technical field of large-span continuous rigid frame bridge construction, in particular to a hanging basket suspended pouring structure and a hanging basket suspended pouring construction method. A hanging basket suspended pouring structure is used for pre-machining a bottom plate, a web plate and a top plate of a suspended pouring box girder and comprises a walking mechanism and a main truss connected to the walking mechanism in a sliding mode, the main truss comprises main trusses arranged symmetrically, longitudinal beams and cross beams, the longitudinal beams and the cross beams are arranged horizontally and vertically, and a suspension mechanism is further connected to the main truss. And a suspension pouring template is fixed on the suspension mechanism. Precise positioning can be achieved, cantilever casting box girder segments can be preprocessed, the construction efficiency is improved, the steel bar framework is standardized, the overall linearity meets the design requirement, and the steel bar installation and construction quality is greatly improved.
本发明涉及大跨度连续刚构桥梁施工技术领域,具体涉及一种挂篮悬浇结构及挂篮悬浇施工方法。一种挂篮悬浇结构,用于对悬浇箱梁的底板、腹板及顶板预加工,包括行走机构和滑动连接在所述行走机构上的主桁架,所述主桁架包括对称设置的主桁以及水平垂直设置的纵梁、横梁,所述主桁架上还连接有悬吊机构,所述悬吊机构上固定有悬浇模板。可精准定位并对悬浇箱梁节段进行预加工,提高施工效率,钢筋骨架标准化、整体线性符合设计要求,大大提高钢筋安装施工质量。
Hanging basket suspended casting structure and hanging basket suspended casting construction method
The invention relates to the technical field of large-span continuous rigid frame bridge construction, in particular to a hanging basket suspended pouring structure and a hanging basket suspended pouring construction method. A hanging basket suspended pouring structure is used for pre-machining a bottom plate, a web plate and a top plate of a suspended pouring box girder and comprises a walking mechanism and a main truss connected to the walking mechanism in a sliding mode, the main truss comprises main trusses arranged symmetrically, longitudinal beams and cross beams, the longitudinal beams and the cross beams are arranged horizontally and vertically, and a suspension mechanism is further connected to the main truss. And a suspension pouring template is fixed on the suspension mechanism. Precise positioning can be achieved, cantilever casting box girder segments can be preprocessed, the construction efficiency is improved, the steel bar framework is standardized, the overall linearity meets the design requirement, and the steel bar installation and construction quality is greatly improved.
本发明涉及大跨度连续刚构桥梁施工技术领域,具体涉及一种挂篮悬浇结构及挂篮悬浇施工方法。一种挂篮悬浇结构,用于对悬浇箱梁的底板、腹板及顶板预加工,包括行走机构和滑动连接在所述行走机构上的主桁架,所述主桁架包括对称设置的主桁以及水平垂直设置的纵梁、横梁,所述主桁架上还连接有悬吊机构,所述悬吊机构上固定有悬浇模板。可精准定位并对悬浇箱梁节段进行预加工,提高施工效率,钢筋骨架标准化、整体线性符合设计要求,大大提高钢筋安装施工质量。
Hanging basket suspended casting structure and hanging basket suspended casting construction method
一种挂篮悬浇结构及挂篮悬浇施工方法
WANG YUFEI (Autor:in) / ZHENG YIN (Autor:in) / WU GANG (Autor:in) / MA JUNWEI (Autor:in) / DAI LANPING (Autor:in) / ZHANG TONGJUN (Autor:in)
12.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Hanging basket suspended casting construction equipment and method
Europäisches Patentamt | 2022
|Descending type suspended casting hanging basket and construction method thereof
Europäisches Patentamt | 2021
|Dismounting method of high-altitude suspended casting hanging basket
Europäisches Patentamt | 2021
|Bridge hanging basket suspension casting construction method
Europäisches Patentamt | 2024
|Construction hanging basket structure and hanging basket moving method
Europäisches Patentamt | 2024
|