Construction method for ecological protection slope of loose and broken soil high slope
A construction method for a loose and broken soil high slope ecological protection slope comprises the following construction steps that a, a top beam prefabricated section, a top beam prefabricated node section, a bottom beam prefabricated section, a bottom beam prefabricated node section, a longitudinal beam prefabricated section and a cross beam prefabricated section of a protection slope structure are prefabricated according to a design drawing, and a cast-in-place section formwork and a plant growing system are prepared; the slope protection structure is characterized in that top beams, cross beams, longitudinal beams and bottom beams are combined, spliced and arranged on the slope surface of a slope body to form a plurality of rectangular lattices; b, the slope surface is leveled, the sunken position of the slope surface is tightly filled with mortar rubbles, and a placement ditch of a slope protection structure is dug; c, performing anchor rod construction on the slope surface; d, connecting prefabricated sections are placed; e, a cast-in-place section formwork is laid at the joint; f, pouring concrete; g, the formwork is dismantled, and a pre-stressed anchor rod is tensioned and sealed; and h, the plant growing system is installed in the rectangular frame. According to the method, simple assembly connecting beam prefabricated parts and joint cast-in-place are combined for construction, the cast-in-place procedure is reduced while the overall stability is guaranteed, and the slope greening rate is also increased.
一种松散破碎土质高边坡生态护坡的施工方法,包括以下施工步骤:a、按设计图纸预制护坡结构的顶梁预制段、顶梁预制节点段、底梁预制段、底梁预制节点段、纵梁预制节段和横梁预制节段,准备现浇段模板及植生体系;护坡结构是由顶梁、横梁、纵梁和底梁组合拼接安置在坡体的坡面上形成多个矩形框格;b、平整坡面,坡面凹陷处紧密填充浆砌片石,并挖设护坡结构的安放沟;c、进行坡面的锚杆施工;d、安放连接预制段;e、在连接处铺设现浇段模板;f、浇筑砼;g、拆除摸板、预应力锚杆张拉及封锚;h、将植生体系安装在矩形框格内。本方法将简易的拼装连系梁预制件和节点现浇结合施工,保证整体稳定性的同时减少现浇工序,也提升了坡面绿化率。
Construction method for ecological protection slope of loose and broken soil high slope
A construction method for a loose and broken soil high slope ecological protection slope comprises the following construction steps that a, a top beam prefabricated section, a top beam prefabricated node section, a bottom beam prefabricated section, a bottom beam prefabricated node section, a longitudinal beam prefabricated section and a cross beam prefabricated section of a protection slope structure are prefabricated according to a design drawing, and a cast-in-place section formwork and a plant growing system are prepared; the slope protection structure is characterized in that top beams, cross beams, longitudinal beams and bottom beams are combined, spliced and arranged on the slope surface of a slope body to form a plurality of rectangular lattices; b, the slope surface is leveled, the sunken position of the slope surface is tightly filled with mortar rubbles, and a placement ditch of a slope protection structure is dug; c, performing anchor rod construction on the slope surface; d, connecting prefabricated sections are placed; e, a cast-in-place section formwork is laid at the joint; f, pouring concrete; g, the formwork is dismantled, and a pre-stressed anchor rod is tensioned and sealed; and h, the plant growing system is installed in the rectangular frame. According to the method, simple assembly connecting beam prefabricated parts and joint cast-in-place are combined for construction, the cast-in-place procedure is reduced while the overall stability is guaranteed, and the slope greening rate is also increased.
一种松散破碎土质高边坡生态护坡的施工方法,包括以下施工步骤:a、按设计图纸预制护坡结构的顶梁预制段、顶梁预制节点段、底梁预制段、底梁预制节点段、纵梁预制节段和横梁预制节段,准备现浇段模板及植生体系;护坡结构是由顶梁、横梁、纵梁和底梁组合拼接安置在坡体的坡面上形成多个矩形框格;b、平整坡面,坡面凹陷处紧密填充浆砌片石,并挖设护坡结构的安放沟;c、进行坡面的锚杆施工;d、安放连接预制段;e、在连接处铺设现浇段模板;f、浇筑砼;g、拆除摸板、预应力锚杆张拉及封锚;h、将植生体系安装在矩形框格内。本方法将简易的拼装连系梁预制件和节点现浇结合施工,保证整体稳定性的同时减少现浇工序,也提升了坡面绿化率。
Construction method for ecological protection slope of loose and broken soil high slope
一种松散破碎土质高边坡生态护坡的施工方法
WANG WEI (Autor:in) / YE XIONG (Autor:in) / LUO GONGGUI (Autor:in) / HUANG YONGJUN (Autor:in) / ZHOU XIN (Autor:in) / ZHANG YUANYUAN (Autor:in) / LIAO KEYI (Autor:in) / ZHAO BIN (Autor:in) / SHEN HAO (Autor:in) / ZHONG XINGHUAN (Autor:in)
15.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2024
|Greening ecological soil slope protection construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|Ecological protection structure for broken rock steep slope and construction method thereof
Europäisches Patentamt | 2020
|