Pipe pile connecting structure and construction method thereof
The invention relates to the technical field of building construction, and discloses a tubular pile connecting structure and a construction method thereof, and the tubular pile connecting structure comprises an upper tubular pile, a lower tubular pile and a connecting sleeve. At least two limiting pieces are arranged at the connecting end of the upper pipe pile in the circumferential direction at intervals, the connecting sleeve is connected to the connecting end of the lower pipe pile in a sleeving mode, at least two limiting grooves are formed in the connecting sleeve in the circumferential direction at intervals, the at least two limiting grooves correspond to the at least two limiting pieces one to one, and the limiting pieces can be clamped and limited in the limiting grooves in a sliding mode. And the upper pipe pile is connected with the lower pipe pile through the connecting sleeve. Due to the fact that the welding position of the connecting sleeve and the upper pipe pile has no stress requirement, spot welding is needed during welding, large-area welding operation is not needed, and stress detection of the welding position is not needed after welding. That is to say, the connection of the upper pipe pile and the lower pipe pile can be completed only through the three steps of lowering the upper pipe pile, rotating and clamping in place and spot welding, the pipe pile connection procedure is simplified, the pipe pile connection requirement is lowered, and the construction efficiency can be effectively improved.
本发明涉及建筑施工技术领域,公开一种管桩连接结构及其施工方法,管桩连接结构包括上管桩、下管桩和连接套管。上管桩的连接端沿周向间隔设置有至少两个限位件,连接套管套设连接于下管桩的连接端,连接套管上沿周向间隔设置有至少两个限位槽,至少两个限位槽与至少两个限位件一一对应,限位件能滑动卡入并限位于限位槽内,以使上管桩通过连接套管与下管桩连接。由于连接套管与上管桩的焊接位置没有受力要求,因此焊接时点焊即可,无需大面积焊接操作,且焊接后无需进行焊接位置受力检测。也就是说,上管桩与下管桩的连接只需进行上管桩下放、转动卡接到位、点焊三步即完成,简化了管桩连接工序,且降低了管桩连接要求,能有效提高施工效率。
Pipe pile connecting structure and construction method thereof
The invention relates to the technical field of building construction, and discloses a tubular pile connecting structure and a construction method thereof, and the tubular pile connecting structure comprises an upper tubular pile, a lower tubular pile and a connecting sleeve. At least two limiting pieces are arranged at the connecting end of the upper pipe pile in the circumferential direction at intervals, the connecting sleeve is connected to the connecting end of the lower pipe pile in a sleeving mode, at least two limiting grooves are formed in the connecting sleeve in the circumferential direction at intervals, the at least two limiting grooves correspond to the at least two limiting pieces one to one, and the limiting pieces can be clamped and limited in the limiting grooves in a sliding mode. And the upper pipe pile is connected with the lower pipe pile through the connecting sleeve. Due to the fact that the welding position of the connecting sleeve and the upper pipe pile has no stress requirement, spot welding is needed during welding, large-area welding operation is not needed, and stress detection of the welding position is not needed after welding. That is to say, the connection of the upper pipe pile and the lower pipe pile can be completed only through the three steps of lowering the upper pipe pile, rotating and clamping in place and spot welding, the pipe pile connection procedure is simplified, the pipe pile connection requirement is lowered, and the construction efficiency can be effectively improved.
本发明涉及建筑施工技术领域,公开一种管桩连接结构及其施工方法,管桩连接结构包括上管桩、下管桩和连接套管。上管桩的连接端沿周向间隔设置有至少两个限位件,连接套管套设连接于下管桩的连接端,连接套管上沿周向间隔设置有至少两个限位槽,至少两个限位槽与至少两个限位件一一对应,限位件能滑动卡入并限位于限位槽内,以使上管桩通过连接套管与下管桩连接。由于连接套管与上管桩的焊接位置没有受力要求,因此焊接时点焊即可,无需大面积焊接操作,且焊接后无需进行焊接位置受力检测。也就是说,上管桩与下管桩的连接只需进行上管桩下放、转动卡接到位、点焊三步即完成,简化了管桩连接工序,且降低了管桩连接要求,能有效提高施工效率。
Pipe pile connecting structure and construction method thereof
管桩连接结构及其施工方法
ZHOU FENG (Autor:in) / YU AIYAN (Autor:in) / ZHENG XIANGJIE (Autor:in) / LI JIQING (Autor:in)
19.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Connecting structure of prestressed concrete pipe pile and construction method thereof
Europäisches Patentamt | 2020
|Steel pipe pile foundation pile body segmented connecting structure and construction method
Europäisches Patentamt | 2024
|Large-diameter PHC pipe pile combined type connecting structure and construction method thereof
Europäisches Patentamt | 2023
|