Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction hanging basket for house building project
The construction hanging basket comprises a base, a first telescopic rod is arranged at the top of the base, a first spring sleeves the outer ring of the first telescopic rod, supporting frames are arranged at the top of the first telescopic rod, connecting rods are arranged between the supporting frames, the connecting rods are multiple sets of linear arrays, and a moving block sleeves the outer ring of each connecting rod; a second spring is arranged between the moving block and the inner wall of the supporting frame. In the process that the movable plate moves downwards, the fixed seat and the limiting column can be driven to move downwards. In the downward moving process of a limiting column and a limiting plate, a second telescopic rod and a third spring on the outer ring can be extruded, the third spring can generate reverse acting force after being extruded, and therefore the damping and buffering effects are achieved. And in the downward moving process of the moving plate, the rotating plate is unfolded towards the two sides around the hinge. In the unfolding process of the rotating plate, the second springs on the two sides can be extruded, and the second springs can also achieve the damping and buffering effects.
本发明公开了一种用于房建工程的施工挂篮,包括底座,底座的顶部设置有第一伸缩杆,第一伸缩杆的外圈套装有第一弹簧,第一伸缩杆的顶部设置有支撑框,支撑框之间设置有连接杆,连接杆为多组线性阵列,连接杆的外圈套装有移动块,移动块与支撑框的内壁之间设置有第二弹簧。本发明中,移动板向下移动的过程中,会带动固定座与限位柱向下移动。限位柱与限位板向下移动的过程中,会挤压第二伸缩杆与外圈的第三弹簧,第三弹簧被挤压后会产生反向的作用力,从而起到减震与缓冲的效果。移动板向下移动的过程中,会将旋转板绕着合页向两侧展开。当旋转板展开的过程中,会挤压两侧的第二弹簧,第二弹簧也会起到减震与缓冲的作用。
Construction hanging basket for house building project
The construction hanging basket comprises a base, a first telescopic rod is arranged at the top of the base, a first spring sleeves the outer ring of the first telescopic rod, supporting frames are arranged at the top of the first telescopic rod, connecting rods are arranged between the supporting frames, the connecting rods are multiple sets of linear arrays, and a moving block sleeves the outer ring of each connecting rod; a second spring is arranged between the moving block and the inner wall of the supporting frame. In the process that the movable plate moves downwards, the fixed seat and the limiting column can be driven to move downwards. In the downward moving process of a limiting column and a limiting plate, a second telescopic rod and a third spring on the outer ring can be extruded, the third spring can generate reverse acting force after being extruded, and therefore the damping and buffering effects are achieved. And in the downward moving process of the moving plate, the rotating plate is unfolded towards the two sides around the hinge. In the unfolding process of the rotating plate, the second springs on the two sides can be extruded, and the second springs can also achieve the damping and buffering effects.
本发明公开了一种用于房建工程的施工挂篮,包括底座,底座的顶部设置有第一伸缩杆,第一伸缩杆的外圈套装有第一弹簧,第一伸缩杆的顶部设置有支撑框,支撑框之间设置有连接杆,连接杆为多组线性阵列,连接杆的外圈套装有移动块,移动块与支撑框的内壁之间设置有第二弹簧。本发明中,移动板向下移动的过程中,会带动固定座与限位柱向下移动。限位柱与限位板向下移动的过程中,会挤压第二伸缩杆与外圈的第三弹簧,第三弹簧被挤压后会产生反向的作用力,从而起到减震与缓冲的效果。移动板向下移动的过程中,会将旋转板绕着合页向两侧展开。当旋转板展开的过程中,会挤压两侧的第二弹簧,第二弹簧也会起到减震与缓冲的作用。
Construction hanging basket for house building project
一种用于房建工程的施工挂篮
QIAN SHIMIAO (Autor:in) / LIN JIANHENG (Autor:in) / WU FENGJIN (Autor:in) / ZHANG HUIHUI (Autor:in)
29.09.2023
Patent
Elektronische Ressource
Chinesisch
Safety construction hanging basket for house building project
Europäisches Patentamt | 2022
|