Prefabricated box girder transverse movement construction method and construction system
The invention relates to the technical field of prefabricated box girder transverse moving construction operation, in particular to a prefabricated box girder transverse moving construction system which comprises sliding platforms and rail assemblies, the rail assemblies are arranged in a criss-cross mode, and the two sliding platforms are matched to walk longitudinally and transversely along the rail assemblies to transport prefabricated box girders. The sliding platform comprises a supporting assembly, a limiting assembly, a longitudinal moving assembly and a transverse moving assembly. Two limiting assemblies are symmetrically arranged on the upper portion of the supporting assembly and movably connected with the two ends of the supporting assembly correspondingly. The upper end of the longitudinal moving assembly is fixedly connected with the bottom of the supporting assembly through a hydraulic telescopic structure. The longitudinal moving assembly longitudinally slides front and back along the rail assembly through first pulleys. The upper ends of the transverse moving assemblies are fixedly connected with the bottoms of the two ends of the supporting assembly through hydraulic telescopic structures, and the transverse moving assemblies transversely slide left and right along the track assemblies through second pulleys; according to the construction system, the construction cost and time can be effectively reduced, and high-efficiency transportation of the prefabricated box girder is guaranteed.
本发明涉及预制箱梁横移施工作业技术领域,具体涉及一种预制箱梁横移施工系统,包括滑移平台与轨道组件,轨道组件纵横交错设置,两个滑移平台配合沿轨道组件纵横行走运输预制箱梁,滑移平台包括支撑组件、限位组件、纵移组件和横移组件;支撑组件上部对称设置两组限位组件,两组限位组件分别与支撑组件两端活动连接;纵移组件上端通过液压伸缩结构与支撑组件底部固定连接,纵移组件通过第一滑轮沿轨道组件纵向前后滑移;支撑组件下部两端分别设置两组横移组件,横移组件上端通过液压伸缩结构与支撑组件两端底部固定连接,横移组件通过第二滑轮沿轨道组件横向左右滑移;该施工系统可以有效减少施工成本及时间,保证预制箱梁高效率的运输。
Prefabricated box girder transverse movement construction method and construction system
The invention relates to the technical field of prefabricated box girder transverse moving construction operation, in particular to a prefabricated box girder transverse moving construction system which comprises sliding platforms and rail assemblies, the rail assemblies are arranged in a criss-cross mode, and the two sliding platforms are matched to walk longitudinally and transversely along the rail assemblies to transport prefabricated box girders. The sliding platform comprises a supporting assembly, a limiting assembly, a longitudinal moving assembly and a transverse moving assembly. Two limiting assemblies are symmetrically arranged on the upper portion of the supporting assembly and movably connected with the two ends of the supporting assembly correspondingly. The upper end of the longitudinal moving assembly is fixedly connected with the bottom of the supporting assembly through a hydraulic telescopic structure. The longitudinal moving assembly longitudinally slides front and back along the rail assembly through first pulleys. The upper ends of the transverse moving assemblies are fixedly connected with the bottoms of the two ends of the supporting assembly through hydraulic telescopic structures, and the transverse moving assemblies transversely slide left and right along the track assemblies through second pulleys; according to the construction system, the construction cost and time can be effectively reduced, and high-efficiency transportation of the prefabricated box girder is guaranteed.
本发明涉及预制箱梁横移施工作业技术领域,具体涉及一种预制箱梁横移施工系统,包括滑移平台与轨道组件,轨道组件纵横交错设置,两个滑移平台配合沿轨道组件纵横行走运输预制箱梁,滑移平台包括支撑组件、限位组件、纵移组件和横移组件;支撑组件上部对称设置两组限位组件,两组限位组件分别与支撑组件两端活动连接;纵移组件上端通过液压伸缩结构与支撑组件底部固定连接,纵移组件通过第一滑轮沿轨道组件纵向前后滑移;支撑组件下部两端分别设置两组横移组件,横移组件上端通过液压伸缩结构与支撑组件两端底部固定连接,横移组件通过第二滑轮沿轨道组件横向左右滑移;该施工系统可以有效减少施工成本及时间,保证预制箱梁高效率的运输。
Prefabricated box girder transverse movement construction method and construction system
一种预制箱梁横移施工方法及施工系统
LI DEKUN (Autor:in) / QIU TAO (Autor:in) / LIU YAFEI (Autor:in) / WANG CHANGYIN (Autor:in) / LI LIANGLIANG (Autor:in) / ZHU CHENGCHAO (Autor:in) / CHENG ZHENGCHAO (Autor:in) / JIANG MINRUI (Autor:in) / XU KUNYI (Autor:in) / JIANG YIKAI (Autor:in)
29.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
PREFABRICATED TRUSS GIRDER STRUCTURE AND CONSTRUCTION METHOD
Europäisches Patentamt | 2024
|Lateral prefabricated yard girder erection construction method
Europäisches Patentamt | 2023
|Prefabricated box girder wet joint construction method
Europäisches Patentamt | 2024
|PREFABRICATED PRECAST CONCRETE GIRDER FOR BUILDING CONSTRUCTION
Europäisches Patentamt | 2015
|