Basement exterior wall post-cast strip plugging device and construction method thereof
The basement exterior wall post-cast strip plugging device comprises a shaped steel plate, a single-head bolt is arranged on the bottom face of the shaped steel plate, a double-head screw is arranged at the bottom of the single-head bolt, a double-square-pipe transverse support is arranged on the portion, close to the bottom face, of the side wall of the double-head screw, and a batten is arranged on the top face of the double-square-pipe transverse support. A formwork is arranged on the top face of the batten, a fastening nut is arranged between the side portion of the double-thread screw and the double-square-pipe transverse support, and a reinforcing rib is arranged on the bottom face of the shaping steel plate, and the post-cast strip shaping steel plate formwork is arranged, so that a traditional construction method of multi-layer plate formwork supporting on the two sides of a post-cast strip can be replaced; the construction progress of structural layers such as a waterproof layer, a heat preservation layer and a protective brick wall of the basement outer wall is accelerated, the completion time of earthwork backfilling around the basement is advanced, the turnover rate of reinforcing materials can be increased, labor input is saved, a water stop screw is not needed in the reinforcing process, only a double-thread screw head is needed, and screw input is saved; and the screw is directly connected with the shear wall, so that time and labor are saved.
本发明公开了一种地下室外墙后浇带封堵装置,其中包括定型钢板,定型钢板的底面设置有用单头螺栓,单头螺栓的底部设置有双头螺杆,双头螺杆的侧壁靠近底面处设置有双方管横撑,双方管横撑的顶面设置有木方,木方的顶面设置有模板,双头螺杆的侧部与双方管横撑之间设置有紧固螺母,定型钢板的底面设置有加强筋,通过设置后浇带定型钢板模板,可以取代后浇带两侧多层板支模的传统施工方法,加快了地下室外墙防水层、保温层和保护砖墙等构造层的施工进度,地下室周边土方回填的完成时间提前,可提高加固材料的周转率,节省人工的投入,且在加固过程无需使用止水螺杆,只需双头螺杆头即可,节省螺杆投入;直接将螺杆与剪力墙连接,省时省力。
Basement exterior wall post-cast strip plugging device and construction method thereof
The basement exterior wall post-cast strip plugging device comprises a shaped steel plate, a single-head bolt is arranged on the bottom face of the shaped steel plate, a double-head screw is arranged at the bottom of the single-head bolt, a double-square-pipe transverse support is arranged on the portion, close to the bottom face, of the side wall of the double-head screw, and a batten is arranged on the top face of the double-square-pipe transverse support. A formwork is arranged on the top face of the batten, a fastening nut is arranged between the side portion of the double-thread screw and the double-square-pipe transverse support, and a reinforcing rib is arranged on the bottom face of the shaping steel plate, and the post-cast strip shaping steel plate formwork is arranged, so that a traditional construction method of multi-layer plate formwork supporting on the two sides of a post-cast strip can be replaced; the construction progress of structural layers such as a waterproof layer, a heat preservation layer and a protective brick wall of the basement outer wall is accelerated, the completion time of earthwork backfilling around the basement is advanced, the turnover rate of reinforcing materials can be increased, labor input is saved, a water stop screw is not needed in the reinforcing process, only a double-thread screw head is needed, and screw input is saved; and the screw is directly connected with the shear wall, so that time and labor are saved.
本发明公开了一种地下室外墙后浇带封堵装置,其中包括定型钢板,定型钢板的底面设置有用单头螺栓,单头螺栓的底部设置有双头螺杆,双头螺杆的侧壁靠近底面处设置有双方管横撑,双方管横撑的顶面设置有木方,木方的顶面设置有模板,双头螺杆的侧部与双方管横撑之间设置有紧固螺母,定型钢板的底面设置有加强筋,通过设置后浇带定型钢板模板,可以取代后浇带两侧多层板支模的传统施工方法,加快了地下室外墙防水层、保温层和保护砖墙等构造层的施工进度,地下室周边土方回填的完成时间提前,可提高加固材料的周转率,节省人工的投入,且在加固过程无需使用止水螺杆,只需双头螺杆头即可,节省螺杆投入;直接将螺杆与剪力墙连接,省时省力。
Basement exterior wall post-cast strip plugging device and construction method thereof
一种地下室外墙后浇带封堵装置及其施工方法
LI KUI (Autor:in) / ZHAO XUETUN (Autor:in) / ZHANG ZHENGHONG (Autor:in) / CHEN MIN (Autor:in) / XU YINGJUN (Autor:in) / HONG XU (Autor:in) / ZHANG HANG (Autor:in) / CHEN HUAWEI (Autor:in) / WANG LIUDONG (Autor:in) / YANG YANG (Autor:in)
29.09.2023
Patent
Elektronische Ressource
Chinesisch
Basement exterior wall post-cast strip plugging waterproof device and construction method thereof
Europäisches Patentamt | 2024
|Basement exterior wall post-cast strip structure and construction method thereof
Europäisches Patentamt | 2021
|Basement exterior wall post-cast strip system and construction method thereof
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2022
|Construction method for closing basement exterior wall post-cast strip
Europäisches Patentamt | 2015
|