Subway station structure construction joint leakage treatment process
According to the subway station structure construction joint leakage treatment process, water channeling channels on the outer side of a construction joint and between a main body structure and a waterproof layer are repaired, and the subsequent durability of leakage treatment is guaranteed; in order to achieve the purpose, the subway station structure construction joint leakage treatment process is characterized by comprising the steps that S1, a wall base face of a construction joint leakage part is cleaned; s2, determining a vertical punching position and an inclined punching position under the assistance of detection equipment; s3, V-shaped groove chiseling treatment is conducted on the wall where the leakage part of the construction joint is located, the groove face is cleaned, and then waterproof treatment is conducted; s4, vertical drilling is conducted on the vertical drilling position, and first grouting treatment is conducted on the interior of a hole; s5, inclined drilling is conducted on the inclined drilling position, and second grouting treatment is conducted on the interior of the hole; and S6, rigid waterproof layers are made on the surfaces of the two sides of the construction joint.
本发明的目的在于提供一种地铁车站结构施工缝渗漏治理工艺,实现对施工缝外侧和主体结构与防水层之间的窜水通道进行修复,保证渗漏治理后续的耐久性;为达到上述目的,本发明的解决方法是提供一种地铁车站结构施工缝渗漏治理工艺,其特征在于,包括:S1:清理施工缝渗漏部位墙体基面;S2:使用检测设备辅助,确定垂直打孔位置和倾斜打孔位置;S3:对施工缝渗漏部位所在的墙体凿V型槽处理,槽面进行清理,再做防水处理;S4:对垂直打孔位置进行垂直钻孔,对孔内进行第一注浆处理;S5:对倾斜打孔位置进行倾斜钻孔,对孔内进行第二注浆处理;S6:在施工缝两侧的表面上作刚性防水层。
Subway station structure construction joint leakage treatment process
According to the subway station structure construction joint leakage treatment process, water channeling channels on the outer side of a construction joint and between a main body structure and a waterproof layer are repaired, and the subsequent durability of leakage treatment is guaranteed; in order to achieve the purpose, the subway station structure construction joint leakage treatment process is characterized by comprising the steps that S1, a wall base face of a construction joint leakage part is cleaned; s2, determining a vertical punching position and an inclined punching position under the assistance of detection equipment; s3, V-shaped groove chiseling treatment is conducted on the wall where the leakage part of the construction joint is located, the groove face is cleaned, and then waterproof treatment is conducted; s4, vertical drilling is conducted on the vertical drilling position, and first grouting treatment is conducted on the interior of a hole; s5, inclined drilling is conducted on the inclined drilling position, and second grouting treatment is conducted on the interior of the hole; and S6, rigid waterproof layers are made on the surfaces of the two sides of the construction joint.
本发明的目的在于提供一种地铁车站结构施工缝渗漏治理工艺,实现对施工缝外侧和主体结构与防水层之间的窜水通道进行修复,保证渗漏治理后续的耐久性;为达到上述目的,本发明的解决方法是提供一种地铁车站结构施工缝渗漏治理工艺,其特征在于,包括:S1:清理施工缝渗漏部位墙体基面;S2:使用检测设备辅助,确定垂直打孔位置和倾斜打孔位置;S3:对施工缝渗漏部位所在的墙体凿V型槽处理,槽面进行清理,再做防水处理;S4:对垂直打孔位置进行垂直钻孔,对孔内进行第一注浆处理;S5:对倾斜打孔位置进行倾斜钻孔,对孔内进行第二注浆处理;S6:在施工缝两侧的表面上作刚性防水层。
Subway station structure construction joint leakage treatment process
一种地铁车站结构施工缝渗漏治理工艺
CAO YUXIN (Autor:in) / LIU GUOQIANG (Autor:in) / GE WENHAO (Autor:in) / JIN LIAN (Autor:in) / JIANG YONGTAO (Autor:in) / WANG GUOYI (Autor:in) / HAO WEIWEI (Autor:in)
29.09.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2021
|Subway station accessory structure construction method
Europäisches Patentamt | 2024
|Construction method of fabricated subway station and fabricated subway station
Europäisches Patentamt | 2024
|Deformation joint grouting and leaking stoppage subway structure water leakage treatment method
Europäisches Patentamt | 2021
|