Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Anti-glare panel foundation pouring device
The invention relates to the field of anti-glare panel construction, in particular to an anti-glare panel foundation pouring device. Comprising a chute, a movable lifting device and a connecting and fixing device, a circular pipe for discharging is connected to the chute discharge hole; a quantity control structure is arranged on the circular tube; the round pipe is connected with a guide pipe; the conduit is a hose; the movable lifting device is arranged below the chute; the connecting and fixing device is arranged between the movable lifting device and the chute, and a clamping plate is arranged on the guide pipe to control the discharging amount at any time. The whole funnel is fixed on the fork teeth of the forklift, and the forklift moves forwards to pour concrete, so that the foundation pouring speed is increased, the concrete waste is reduced, the construction flexibility is improved, and the damage to the finished asphalt upper layer due to the repeated adjustment of a tank truck is avoided.
本发明涉及防眩板施工领域,具体涉及一种防眩板基础浇筑装置。包括溜槽、移动升降装置、连接固定装置;溜槽出料口上连接有出料的圆管;圆管上设有控量结构;圆管上连接有导管;导管为软管;移动升降装置设在溜槽下方;连接固定装置设在移动升降装置和溜槽之间,导管上设置卡板,随时控制出料量。整个漏斗固定在叉车叉齿上,通过叉车向前移动以浇筑混凝土,加快了基础浇注速度,减少了混凝土浪费,提高了施工的灵活性,避免了因罐车多次调整对已完成的沥青上面层的破坏。
Anti-glare panel foundation pouring device
The invention relates to the field of anti-glare panel construction, in particular to an anti-glare panel foundation pouring device. Comprising a chute, a movable lifting device and a connecting and fixing device, a circular pipe for discharging is connected to the chute discharge hole; a quantity control structure is arranged on the circular tube; the round pipe is connected with a guide pipe; the conduit is a hose; the movable lifting device is arranged below the chute; the connecting and fixing device is arranged between the movable lifting device and the chute, and a clamping plate is arranged on the guide pipe to control the discharging amount at any time. The whole funnel is fixed on the fork teeth of the forklift, and the forklift moves forwards to pour concrete, so that the foundation pouring speed is increased, the concrete waste is reduced, the construction flexibility is improved, and the damage to the finished asphalt upper layer due to the repeated adjustment of a tank truck is avoided.
本发明涉及防眩板施工领域,具体涉及一种防眩板基础浇筑装置。包括溜槽、移动升降装置、连接固定装置;溜槽出料口上连接有出料的圆管;圆管上设有控量结构;圆管上连接有导管;导管为软管;移动升降装置设在溜槽下方;连接固定装置设在移动升降装置和溜槽之间,导管上设置卡板,随时控制出料量。整个漏斗固定在叉车叉齿上,通过叉车向前移动以浇筑混凝土,加快了基础浇注速度,减少了混凝土浪费,提高了施工的灵活性,避免了因罐车多次调整对已完成的沥青上面层的破坏。
Anti-glare panel foundation pouring device
一种防眩板基础浇筑装置
WANG YONGZE (Autor:in) / WANG PENG (Autor:in) / GAO LIN (Autor:in) / DAI MINGZE (Autor:in) / DU QINGDIAN (Autor:in) / YANG FENGGANG (Autor:in) / DING CHAO (Autor:in) / LI ZHEN (Autor:in) / WANG XINYU (Autor:in) / DENG DABIN (Autor:in)
03.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Anti-glare panel for expressway and preparation method of anti-glare panel
Europäisches Patentamt | 2023
|Photovoltaic panel foundation pouring auxiliary suite structure
Europäisches Patentamt | 2023
|