The invention relates to a Mongolian yurt type blast furnace casting house roof panel replacement method which comprises the following steps: 1, mounting a foundation construction facility, and mounting a winch, a working platform and a climbing ladder track; secondly, the roof panels are dismantled, specifically, the roof top plates and the inclined roof panels are dismantled from top to bottom, meanwhile, the climbing ladder is used for sliding to the next span for operation, and the roof panels are replaced and installed synchronously; 3, replacing and installing a roof panel, namely reinforcing a casting house roof top plate structure and replacing an inclined roof panel through a climbing ladder, and completing the material pouring operation; and fourthly, the roof panels are protected, and anticorrosive coating work of the roof panels is conducted through the escalator for people to go on. The method has the advantages that resources are saved and a certain construction period is shortened by adopting the method that only the top plate and the inclined plane are removed and the foundation structure is reserved; the operation platform, the climbing ladder and the track are arranged, so that the construction time is greatly shortened, and technical support is provided for guaranteeing the construction period of the overhaul of the blast furnace.
本发明涉及一种蒙古包式高炉出铁场屋面板更换方法,包括如下步骤:一、基础施工设施安装,安装卷扬机、工作平台及上人爬梯轨道;二、屋面板拆除,采用屋面顶板及斜屋面板从上至下的顺序进行拆除,同时利用上人爬梯滑动至下一跨作业,同步进行屋面板的更换安装;三、屋面板更换安装,通过上人爬梯对出铁场屋面顶板结构进行加固作业和斜屋面板的更换工作,并完成材料倒运作业;四、对屋面板防护处理,利用上人扶梯进行屋面板的防腐涂装工作。本发明的优点是,采用只拆除顶板及斜面保留基础结构器的方法一方面节省了资源,另一方面缩短一定的工期;利通设置的操作平台、上人爬梯及轨道,极大的减少了施工时间,为高炉大修保障工期做出了技术支持。
Mongolian yurt type blast furnace casting house roof panel replacement method
The invention relates to a Mongolian yurt type blast furnace casting house roof panel replacement method which comprises the following steps: 1, mounting a foundation construction facility, and mounting a winch, a working platform and a climbing ladder track; secondly, the roof panels are dismantled, specifically, the roof top plates and the inclined roof panels are dismantled from top to bottom, meanwhile, the climbing ladder is used for sliding to the next span for operation, and the roof panels are replaced and installed synchronously; 3, replacing and installing a roof panel, namely reinforcing a casting house roof top plate structure and replacing an inclined roof panel through a climbing ladder, and completing the material pouring operation; and fourthly, the roof panels are protected, and anticorrosive coating work of the roof panels is conducted through the escalator for people to go on. The method has the advantages that resources are saved and a certain construction period is shortened by adopting the method that only the top plate and the inclined plane are removed and the foundation structure is reserved; the operation platform, the climbing ladder and the track are arranged, so that the construction time is greatly shortened, and technical support is provided for guaranteeing the construction period of the overhaul of the blast furnace.
本发明涉及一种蒙古包式高炉出铁场屋面板更换方法,包括如下步骤:一、基础施工设施安装,安装卷扬机、工作平台及上人爬梯轨道;二、屋面板拆除,采用屋面顶板及斜屋面板从上至下的顺序进行拆除,同时利用上人爬梯滑动至下一跨作业,同步进行屋面板的更换安装;三、屋面板更换安装,通过上人爬梯对出铁场屋面顶板结构进行加固作业和斜屋面板的更换工作,并完成材料倒运作业;四、对屋面板防护处理,利用上人扶梯进行屋面板的防腐涂装工作。本发明的优点是,采用只拆除顶板及斜面保留基础结构器的方法一方面节省了资源,另一方面缩短一定的工期;利通设置的操作平台、上人爬梯及轨道,极大的减少了施工时间,为高炉大修保障工期做出了技术支持。
Mongolian yurt type blast furnace casting house roof panel replacement method
一种蒙古包式高炉出铁场屋面板更换方法
GUO GAOFENG (Autor:in) / ZHANG MINGRONG (Autor:in) / GE HAIYANG (Autor:in) / LIU CHAOHUI (Autor:in) / CHI ZHIWEI (Autor:in) / MIN LIANGJIAN (Autor:in)
03.10.2023
Patent
Elektronische Ressource
Chinesisch