Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method for righting and reinforcing old wall of care wall
The invention provides a righting and reinforcing method for an old illuminated wall. The righting and reinforcing method comprises the following steps that S1, data measurement is conducted on the current position of the old illuminated wall on site and the in-situ ground; s2, a fixing frame is installed on the outer side of the current position of the old illuminated wall, and then front-back correction of the current position of the old illuminated wall in the length direction is completed through the fixing frame and a pressing plate; s3, a constructional column is arranged on one side of the current position of the old wall, the constructional column extends into the in-situ ground, meanwhile, a steel tie bar penetrates through the current position of the old wall, and one side of the steel tie bar is anchored in the constructional column; s4, a first grouting pipe and a second grouting pipe are arranged on the in-situ ground and poured, and one side of the second grouting pipe is arranged in the constructional column in a penetrating mode; s5, the reinforcing steel plate and the other side of the constructional column are fixed on the other side of the current position of the old wall; and S6, after the overall structure is stable, the fixing frame is dismantled. The method is ingenious in design, the construction safety and efficiency are greatly improved, and it is guaranteed that the old wall is good in repairing effect and high in quality.
本发明提供一种照壁旧墙扶正加固方法,包括以下步骤:S1、对现场的照壁旧墙现状位置和原位地面进行数据的测量;S2、在照壁旧墙现状位置的外侧安装固定架,然后利用固定架和压板完成照壁旧墙现状位置在长度方向上的前后矫正;S3、在照壁旧墙现状位置的一侧设置构造柱,构造柱伸入原位地面内,同时将拉结钢筋贯穿在照壁旧墙现状位置内,拉结钢筋的一侧锚固在构造柱内;S4、在原位地面上设置第一注浆管和第二注浆管并浇筑,第二注浆管一侧穿设在构造柱内;S5、在照壁旧墙现状位置的另一侧将加固钢板和构造柱的另一侧固定;S6、待整体结构稳定后对固定架进行拆除。本发明设计巧妙,大幅度提高施工的安全和效率,保证了照壁旧墙修复的效果好,质量高。
Method for righting and reinforcing old wall of care wall
The invention provides a righting and reinforcing method for an old illuminated wall. The righting and reinforcing method comprises the following steps that S1, data measurement is conducted on the current position of the old illuminated wall on site and the in-situ ground; s2, a fixing frame is installed on the outer side of the current position of the old illuminated wall, and then front-back correction of the current position of the old illuminated wall in the length direction is completed through the fixing frame and a pressing plate; s3, a constructional column is arranged on one side of the current position of the old wall, the constructional column extends into the in-situ ground, meanwhile, a steel tie bar penetrates through the current position of the old wall, and one side of the steel tie bar is anchored in the constructional column; s4, a first grouting pipe and a second grouting pipe are arranged on the in-situ ground and poured, and one side of the second grouting pipe is arranged in the constructional column in a penetrating mode; s5, the reinforcing steel plate and the other side of the constructional column are fixed on the other side of the current position of the old wall; and S6, after the overall structure is stable, the fixing frame is dismantled. The method is ingenious in design, the construction safety and efficiency are greatly improved, and it is guaranteed that the old wall is good in repairing effect and high in quality.
本发明提供一种照壁旧墙扶正加固方法,包括以下步骤:S1、对现场的照壁旧墙现状位置和原位地面进行数据的测量;S2、在照壁旧墙现状位置的外侧安装固定架,然后利用固定架和压板完成照壁旧墙现状位置在长度方向上的前后矫正;S3、在照壁旧墙现状位置的一侧设置构造柱,构造柱伸入原位地面内,同时将拉结钢筋贯穿在照壁旧墙现状位置内,拉结钢筋的一侧锚固在构造柱内;S4、在原位地面上设置第一注浆管和第二注浆管并浇筑,第二注浆管一侧穿设在构造柱内;S5、在照壁旧墙现状位置的另一侧将加固钢板和构造柱的另一侧固定;S6、待整体结构稳定后对固定架进行拆除。本发明设计巧妙,大幅度提高施工的安全和效率,保证了照壁旧墙修复的效果好,质量高。
Method for righting and reinforcing old wall of care wall
照壁旧墙扶正加固方法
HE LIN (Autor:in) / LU SHUFENG (Autor:in) / WEN CHUN (Autor:in) / ZHANG XUANYU (Autor:in) / WANG HANLIN (Autor:in) / ZHENG YUJUN (Autor:in) / ZHOU HONGJI (Autor:in) / CHEN ZUI (Autor:in) / XIA ZHIQIANG (Autor:in) / GAO HONG (Autor:in)
03.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Reinforcing and righting construction method for residual inclined brick wall of historical building
Europäisches Patentamt | 2024
|Ancient building cob wall righting device and method thereof
Europäisches Patentamt | 2024
|STONE WALL OR MASONRY WALL REINFORCING METHOD AND REINFORCING STRUCTURE
Europäisches Patentamt | 2021
|