Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction structure and construction method of indoor ice rink refrigeration pipeline
The invention relates to the field of ice rink construction, in particular to a construction structure and a construction method of an indoor ice rink refrigeration pipeline. Comprising a concrete base layer, a plurality of control lines are arranged on the concrete base layer, each control line is provided with a plurality of integrated pipe bases, and refrigeration pipelines and connecting steel bars are jointly installed on all the integrated pipe bases; an anti-freezing concrete pressure-bearing layer is poured on the concrete base layer, and the integrated pipe base, the refrigeration pipeline and the connecting steel bars are all arranged in the anti-freezing concrete pressure-bearing layer. Functions of a traditional pipeline support and a traditional steel bar horse stool support are combined through the integrated pipe base, and the technical problem that ice rink pipelines and steel bars are arranged on the same layer is solved; the existing construction technology is optimized, and the traditional mode that the pipeline support and the split heads are installed separately is not limited; the construction difficulty is reduced, the construction quality of a project is improved, and the construction period is shortened.
本发明为冰场施工领域,是一种室内冰场制冷管道的施工结构及施工方法。包括混凝土基层,在混凝土基层上排列设置有若干条控制线,在每条控制线上均设置有若干个一体式管座,在所有一体式管座上共同安装有制冷管道以及连接钢筋;在混凝土基层上浇筑有抗冻混凝土承压层,一体式管座、制冷管道和连接钢筋均置于抗冻混凝土承压层内。通过一体式管座将传统管道支座与传统钢筋马凳支架的功能结合,解决了冰场管道及钢筋同层布置的技术问题;优化了现有施工工艺,不在局限于将管道支架及马凳分别安装的传统方式;不仅降低了施工难度,而且提高了工程的施工质量,缩短了施工工期。
Construction structure and construction method of indoor ice rink refrigeration pipeline
The invention relates to the field of ice rink construction, in particular to a construction structure and a construction method of an indoor ice rink refrigeration pipeline. Comprising a concrete base layer, a plurality of control lines are arranged on the concrete base layer, each control line is provided with a plurality of integrated pipe bases, and refrigeration pipelines and connecting steel bars are jointly installed on all the integrated pipe bases; an anti-freezing concrete pressure-bearing layer is poured on the concrete base layer, and the integrated pipe base, the refrigeration pipeline and the connecting steel bars are all arranged in the anti-freezing concrete pressure-bearing layer. Functions of a traditional pipeline support and a traditional steel bar horse stool support are combined through the integrated pipe base, and the technical problem that ice rink pipelines and steel bars are arranged on the same layer is solved; the existing construction technology is optimized, and the traditional mode that the pipeline support and the split heads are installed separately is not limited; the construction difficulty is reduced, the construction quality of a project is improved, and the construction period is shortened.
本发明为冰场施工领域,是一种室内冰场制冷管道的施工结构及施工方法。包括混凝土基层,在混凝土基层上排列设置有若干条控制线,在每条控制线上均设置有若干个一体式管座,在所有一体式管座上共同安装有制冷管道以及连接钢筋;在混凝土基层上浇筑有抗冻混凝土承压层,一体式管座、制冷管道和连接钢筋均置于抗冻混凝土承压层内。通过一体式管座将传统管道支座与传统钢筋马凳支架的功能结合,解决了冰场管道及钢筋同层布置的技术问题;优化了现有施工工艺,不在局限于将管道支架及马凳分别安装的传统方式;不仅降低了施工难度,而且提高了工程的施工质量,缩短了施工工期。
Construction structure and construction method of indoor ice rink refrigeration pipeline
一种室内冰场制冷管道的施工结构及施工方法
WANG SHAOFEI (Autor:in) / ZUO JUN (Autor:in) / HU CHENTAO (Autor:in) / HUANG KUN (Autor:in) / LI WEIPENG (Autor:in) / ZHAO JUNXUE (Autor:in)
03.10.2023
Patent
Elektronische Ressource
Chinesisch
ICE RINK AND COMPONENTS EMPLOYED FOR ICE RINK CONSTRUCTION
Europäisches Patentamt | 2019
|Indoor ice rink refrigerating system and construction technology thereof
Europäisches Patentamt | 2024
|ICE RINK AND COMPONENTS EMPLOYED FOR ICE RINK CONSTRUCTION
Europäisches Patentamt | 2019
|A grandstand construction for German ice rink
British Library Online Contents | 2007